Analisa resiko pembangunan pengamanan pantai terhadap kinerja waktu pelaksanaan = Risk analysis of construction of coast protection against the performance of implementation time / Hendra Utama
Hendra Utama;
Yusuf Latief, supervisor; Khrisna Mochtar, supervisor; Eddy Subiyanto, examiner; Leni Sagita Riantini, examiner; Setyo Supriyadi Sipadi, examiner
([Publisher not identified]
, 2015)
|
[ABSTRAK Pada proyek pembangunan pengamanan pantai seringkali ditemui masalah yangdapat menyebabkan kegagalan maupun tidak selesainya proyek tepat padawaktunya sehingga mengakibatkan menurunnya kinerja waktu pelaksanaan.Penelitian ini bertujuan menemukan faktor-faktor resiko yang sangat berperanatau mendominasi sebagai penyebab keterlambatan dengan maksud agar prosesperencanaan, pelaksanaan, penjadwalan proyek konstruksi dapat dilakukandengan lebih lengkap dan cermat sehingga keterlambatan sedapat mungkindihindarkan atau dikendalikan. Temuan penyebab keterlambatan dikonfirmasikandengan menggunakan kuesioner yang didistribusikan kepada para pemilik proyekdi masing-masing balai, menunjukkan bahwa masalah-masalah keterlambatanpenyerahan lapangan dan perubahan desain merupakan faktor-faktor yangdominan sebagai penyebab keterlambatan waktu dari sisi pemilik proyek. ABSTRACT In the construction of coast protection projects often encountered problems thatcan cause a failure or not timely completion of the project, resulting in degradedperformance of implementation time. This study aims to find risk factors thatgreatly contributed to or dominated as the cause of the delay with a view to theplanning, implementation, construction project scheduling can be done with amore complete and accurate so that the delay as much as possible be avoided orcontrolled. The findings of the cause of delay confirmed using a questionnairedistributed to the owners of the project in each of the office, showed that theproblems of delay delivery of the field and design changes are the dominantfactors as the cause of the delay time of the project owner, In the construction of coast protection projects often encountered problems thatcan cause a failure or not timely completion of the project, resulting in degradedperformance of implementation time. This study aims to find risk factors thatgreatly contributed to or dominated as the cause of the delay with a view to theplanning, implementation, construction project scheduling can be done with amore complete and accurate so that the delay as much as possible be avoided orcontrolled. The findings of the cause of delay confirmed using a questionnairedistributed to the owners of the project in each of the office, showed that theproblems of delay delivery of the field and design changes are the dominantfactors as the cause of the delay time of the project owner] |
T43649-Hendra Utama.pdf :: Unduh
|
No. Panggil : | T43649 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | [Place of publication not identified]: [Publisher not identified], 2015 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xviii, 223 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T43649 | 15-17-992938500 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20415959 |