Feasibility analysis of investment with life cycle cost approach on prasti tunnel water treatment plant (WTP) conceptual design
([FT UII, Fakultas Teknik Universitas Indonesia], 2014)
|
Jakarta‟s problems such as flood and traffic inspired a PRASTI (Public Railway andStormwater Infrastructure) infrastructure design, which is a multifunctional tunnel whose one of itsfunction is to drain Western Canal Flood (BKB) overflow. The feasibility study of this project initiatedthe development of PRASTI Water Treatment Plant (WTP) which aimed to increase the addedfunctions of this infrastructure design. Before the construction of WTP, project feasibility study wasrequired to see investment feasibility so that investors could join in developing this infrastructure. Thisstudy aimed to analyze the feasibility of the infrastructure using Life Cycle Cost (LCC) method byconsidering cost of development, operational, and maintenance costs as well as revenue componentsin 2014-2045 period. Cost analysis was obtained from benchmarking to several countries andapplications of different technologies. Based on the study it‟s discovered that investment feasibility of aWTP project was strongly influenced by field condition (electricity and chemical needs) which will beused. Difference of operational and maintenance cost schemes in Life Cycle Cost analysis in PRASTIWTP project indicated that the project is financially feasible with IRR amounting to 23% (optimistic)and IRR value of 8% (pessimistic). |
![]()
|
No. Panggil : | MK-Pdf |
Subjek : | |
Penerbitan : | [Place of publication not identified]: [FT UII, Fakultas Teknik Universitas Indonesia], 2014 |
Program Studi : |
Bahasa : | eng |
Sumber Pengatalogan : | |
Tipe Konten : | |
Tipe Media : | |
Tipe Carrier : | |
Deskripsi Fisik : | hlm. 379-387 |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
MK-Pdf | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20420555 |