Rancangan penjadwalan kedatangan supplier raw material (Inbound Logistic) menggunakan metode trucks turnaround time pada Perusahaan FMCG = The draft scheduling for the arrival of raw material suppliers inbound logistic by using truck turnaround time method in FMCG Company
Fikry Aulia Putra;
Rahmat Nurcahyo, supervisor
(Fakultas Teknik Universitas Indonesia, 2016)
|
Dalam mencapai performa perusahaan terutama dibidang manajemen logisitik, penjadwalan yang baik menjadi aspek penting untuk mendukung eksistensi perusahaan dalam mencapai visi-visinya. Dalam pencapaian performa yang baik, sebuah perusahaan FMCG mengalami kendala pada aktifitas inbound logistic-nya. Permasalahan yang ada berupa lamanya waktu tunggu truk yang melakukan kegiatan antrian unloading material di gudang bahan baku pabrik. Hal tersebut berakibat buruk bagi perusahaan dan perusahaan pemasok bahan baku seperti kerugian finansial, terganggunya aktifitas pabrik, terhambatnya lini produksi, dan rendahnya nilai akurasi aktifitas unloading bahan baku. Penelitian ini bertujuan untuk memberikan rancangan penjadwalan bagi kedatangan truk pemasok bahan baku dengan mempertimbangkan aspek aktual seperti trucks turnaround time dan tingkat kedatangan truk setiap harinya. Penelitian ini menghasilkan rancangan perbaikan penjadwalan terkait waktu tunggu truk supplier untuk melakukan unloading bahan baku di area gudang pabrik. Dengan mempertimbangkan trucks turnaround time di area pabrik, penelitian ini menghasilkan perbaikan proses kedatangan dengan menurunkan waktu tunggu untuk gudang 42020 sebesar 57,2 % dari 270 menit menjadi 115,3 menit dan untuk gudang 42030 sebesar 43,2 % dari 185 menit menjadi 104,1 menit. In achieving the outstanding company's performance, especially in the field of logistical management, scheduling strongly become an important aspect to support the existence of the company to reach their visions. In obtaining a good performance, a FMCG company has constraints on the activities of its inbound logistics. One of the problems that exist is the long waiting time/queuing time of trucks to conduct raw material unloading in the factory warehouses. It gives negative impacts for the company and the suppliers such as financial loss, disruption of factory activity, inhibition of the production line, and the low value of the accuracy of the raw material unloading activities. This study aims to give a scheduling plan for the arrival of the truck suppliers taking into account aspects such as trucks actual turnaround time and the rate of arrival of trucks every day. This study resulted in a fixed draft scheduling truck waiting time supplier to perform the unloading of raw materials in the warehouse area of the plant. Taking into consideration of trucks turnaround time in the factory area, this research resulted in the arrival process improvements by reducing the waiting time for the warehouse 42020 amount 57.2% from 270 minutes to 115.3 minutes and for warehouse 42030 amount 43.2% from 185 minutes to 104,1 minute. |
S62428-Fikry Aulia Putra.pdf :: Unduh
|
No. Panggil : | S62428 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Teknik Universitas Indonesia, 2016 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | |
Tipe Konten : | |
Tipe Media : | |
Tipe Carrier : | |
Deskripsi Fisik : | xiii, 55 hlm. : ill. ; 28 cm. |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
S62428 | 14-22-07315253 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20421515 |