Penentuan lokasi dan target sumur panas bumi pada wilayah kerja Panas Bumi Jaboi menggunakan aplikasi metode CSAMT dengan pemodelan 2D dengan data pendukung metode gravity = Determination of location and geothermal wells targeting in Jaboi Geothermal working area using CSAMT method application with 2D modeling of gravity method supporting data
Mustika Delimantoro;
Yunus Daud, supervisor; Yayan Sofyan, examiner; Surya Darma, examiner; Zaenal Abidin, examiner
([Publisher not identified]
, 2015)
|
[ABSTRAK PT. Sabang Geothermal Energi (PT. SGE) akan melakukan pemboran 2 sumur panasbumi pada WKP Jaboi untuk pembangkitan energi listrik 2 x 5 MW sehinggadiperlukan penentuan lokasi sumur dan target pemboran yang diperkirakan dapatmenghasilkan output uap yang maksimal. Dengan metode CSAMT yang ditunjangmetode Gaya Berat akan dilakukan penelitian untuk mencari lokasi zona-zona produksipada WKP Jaboi. Pemodelan terhadap data resistivitas batuan dari pengukuran denganmetode CSAMT yang dikombinasikan dengan pemodelan Gaya Berat, geologi danhidrologi akan memberikan gambaran zona-zona produksi tersebut. Pemodelandilakukan dengan model 2D menggunakan software WinGlinkTM. Penentuan lokasi dantarget pemboran yang tepat dapat mengurangi investasi yang diperlukan oleh PT. SGEsecara signifikan sehingga memberikan tingkat pengembalian investasi yang lebih baikuntuk proyek panas bumi pada WKP Jaboi. ABSTRACTPT Sabang Geothermal Energi (PT SGE) is planning to drill 2 geothermal wells in JaboiGeothermal Working Area for 2 x 5 MW generation electricity, so it is required todetermination of the well location and drilling targets which is expected to producemaximum steam output. CSAMT method that is supported by gravity method will beconducted to located the production zones in Jaboi Geothermal Working Area.Modeling of rock resistivity data from CSAMT method measurements which iscombined with gravity modeling, geology, and hydrology will provide an overview ofthe production zones. Modeling was performed with a 2D model using WinGlinkTMsoftware. Precise determination of location and drilling targets will reduce the necessaryinvestment by PT SGE significantly, so as to provide the return on investment that isbetter for the geothermal project in Jaboi Geothermal Working Area.;PT Sabang Geothermal Energi (PT SGE) is planning to drill 2 geothermal wells in JaboiGeothermal Working Area for 2 x 5 MW generation electricity, so it is required todetermination of the well location and drilling targets which is expected to producemaximum steam output. CSAMT method that is supported by gravity method will beconducted to located the production zones in Jaboi Geothermal Working Area.Modeling of rock resistivity data from CSAMT method measurements which iscombined with gravity modeling, geology, and hydrology will provide an overview ofthe production zones. Modeling was performed with a 2D model using WinGlinkTMsoftware. Precise determination of location and drilling targets will reduce the necessaryinvestment by PT SGE significantly, so as to provide the return on investment that isbetter for the geothermal project in Jaboi Geothermal Working Area., PT Sabang Geothermal Energi (PT SGE) is planning to drill 2 geothermal wells in JaboiGeothermal Working Area for 2 x 5 MW generation electricity, so it is required todetermination of the well location and drilling targets which is expected to producemaximum steam output. CSAMT method that is supported by gravity method will beconducted to located the production zones in Jaboi Geothermal Working Area.Modeling of rock resistivity data from CSAMT method measurements which iscombined with gravity modeling, geology, and hydrology will provide an overview ofthe production zones. Modeling was performed with a 2D model using WinGlinkTMsoftware. Precise determination of location and drilling targets will reduce the necessaryinvestment by PT SGE significantly, so as to provide the return on investment that isbetter for the geothermal project in Jaboi Geothermal Working Area.] |
T45309-Mustika Delimantoro.pdf :: Unduh
|
No. Panggil : | T45309 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | [Place of publication not identified]: [Publisher not identified], 2015 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xii, 83 pages : illustration ; 30 cm |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T45309 | 15-17-418985436 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20422739 |