:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Penentuan lokasi dan target sumur panas bumi pada wilayah kerja Panas Bumi Jaboi menggunakan aplikasi metode CSAMT dengan pemodelan 2D dengan data pendukung metode gravity = Determination of location and geothermal wells targeting in Jaboi Geothermal working area using CSAMT method application with 2D modeling of gravity method supporting data

Mustika Delimantoro; Yunus Daud, supervisor; Yayan Sofyan, examiner; Surya Darma, examiner; Zaenal Abidin, examiner ([Publisher not identified] , 2015)

 Abstrak

[ABSTRAK
PT. Sabang Geothermal Energi (PT. SGE) akan melakukan pemboran 2 sumur panas
bumi pada WKP Jaboi untuk pembangkitan energi listrik 2 x 5 MW sehingga
diperlukan penentuan lokasi sumur dan target pemboran yang diperkirakan dapat
menghasilkan output uap yang maksimal. Dengan metode CSAMT yang ditunjang
metode Gaya Berat akan dilakukan penelitian untuk mencari lokasi zona-zona produksi
pada WKP Jaboi. Pemodelan terhadap data resistivitas batuan dari pengukuran dengan
metode CSAMT yang dikombinasikan dengan pemodelan Gaya Berat, geologi dan
hidrologi akan memberikan gambaran zona-zona produksi tersebut. Pemodelan
dilakukan dengan model 2D menggunakan software WinGlinkTM. Penentuan lokasi dan
target pemboran yang tepat dapat mengurangi investasi yang diperlukan oleh PT. SGE
secara signifikan sehingga memberikan tingkat pengembalian investasi yang lebih baik
untuk proyek panas bumi pada WKP Jaboi.

ABSTRACT
PT Sabang Geothermal Energi (PT SGE) is planning to drill 2 geothermal wells in Jaboi
Geothermal Working Area for 2 x 5 MW generation electricity, so it is required to
determination of the well location and drilling targets which is expected to produce
maximum steam output. CSAMT method that is supported by gravity method will be
conducted to located the production zones in Jaboi Geothermal Working Area.
Modeling of rock resistivity data from CSAMT method measurements which is
combined with gravity modeling, geology, and hydrology will provide an overview of
the production zones. Modeling was performed with a 2D model using WinGlinkTM
software. Precise determination of location and drilling targets will reduce the necessary
investment by PT SGE significantly, so as to provide the return on investment that is
better for the geothermal project in Jaboi Geothermal Working Area.;PT Sabang Geothermal Energi (PT SGE) is planning to drill 2 geothermal wells in Jaboi
Geothermal Working Area for 2 x 5 MW generation electricity, so it is required to
determination of the well location and drilling targets which is expected to produce
maximum steam output. CSAMT method that is supported by gravity method will be
conducted to located the production zones in Jaboi Geothermal Working Area.
Modeling of rock resistivity data from CSAMT method measurements which is
combined with gravity modeling, geology, and hydrology will provide an overview of
the production zones. Modeling was performed with a 2D model using WinGlinkTM
software. Precise determination of location and drilling targets will reduce the necessary
investment by PT SGE significantly, so as to provide the return on investment that is
better for the geothermal project in Jaboi Geothermal Working Area., PT Sabang Geothermal Energi (PT SGE) is planning to drill 2 geothermal wells in Jaboi
Geothermal Working Area for 2 x 5 MW generation electricity, so it is required to
determination of the well location and drilling targets which is expected to produce
maximum steam output. CSAMT method that is supported by gravity method will be
conducted to located the production zones in Jaboi Geothermal Working Area.
Modeling of rock resistivity data from CSAMT method measurements which is
combined with gravity modeling, geology, and hydrology will provide an overview of
the production zones. Modeling was performed with a 2D model using WinGlinkTM
software. Precise determination of location and drilling targets will reduce the necessary
investment by PT SGE significantly, so as to provide the return on investment that is
better for the geothermal project in Jaboi Geothermal Working Area.]

 File Digital: 1

Shelf
 T45309-Mustika Delimantoro.pdf :: Unduh

LOGIN required

 Kata Kunci

 Metadata

No. Panggil : T45309
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2015
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xii, 83 pages : illustration ; 30 cm
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T45309 15-17-418985436 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20422739