:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Pembangunan giant sea wall dengan metode risk based project financing = Giant sea wall construction with risk based project financing

Yudo Widiatmoko; Krishna Mochtar, supervisor; Sawarendro, examiner; Yusuf Latief, examiner; Eddy Subiyanto, examiner; Petroceany, Jade Sjafrecia, examiner (Fakultas Teknik Universitas Indonesia, 2016)

 Abstrak

ABSTRAK
Pantai Utara kota DKI Jakarta (Pantura Jakarta) termasuk ke dalam kawasan strategis. Kawasaan Pantura Jakarta memiliki banyak permasalahan diantaranya adalah penurunan tanah dan banjir pasang air laut (banjir Rob). Strategi pengamanan pantai Jakarta merupakan alternatif penataan kawasan strategis Pantura Jakarta. Pembangunan Giant Sea Wall (GSW)/ dinding laut raksasa dengan menggunakan mekanisme Public Private Partnership (PPP), merupakan salah satu sekenario alternatif dari penataan kawasan strategis pantura Jakarta. Namun dengan besarnya probabilitas kegagalan proyek dengan sekala besar yang menggunakan mekanisme PPP, penting untuk mengkaji dan merencanakan Manajemen Risiko termasuk rencana mitigasi risiko pada proyek ini dengan melakukan simulasi monte carlo pada model finansial yang diintegrasikan dengan pengaruh risiko untuk menentukan Expected Value of Project yang dibandingkan dengan batasan batasan yang dapat diterima para stakeholder untuk menjadi pertimbangan bagi pengambil keputusan.

ABSTRACT
North coast city of Jakarta (Jakarta northern coast) are included in the strategic region. Northern Coast Jakarta has a lot of problems include land subsidence and sea water flooding (flood Rob). Jakarta coastal protection strategy is an alternative arrangement of a strategic area north coast of Jakarta. Development of Giant Sea Wall (GSW) / giant sea wall by using the mechanism of Public Private Partnership (PPP), is one of the alternative scenario of structuring a strategic area north coast of Jakarta. However, the magnitude of the probability of failure of projects with large scale that uses the mechanism of PPP, it is important to assess and plan for risk management including risk mitigation plan in the project by performing monte carlo simulation on a financial model that is integrated with the influence of risk to determine the Expected Value of Project compared to limits of acceptable limits stakeholders to be considered for decision makers.

 File Digital: 1

Shelf
 T45514-Yudo Widiatmoko.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T45514
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2016
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xix, 358 pages ; illustration : 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T45514 15-18-150021702 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20423427