:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Analisis value stream mapping (VSM) pada line produksi assy outer mirror D17D di PT Astra Komponen Indonesia (ASKI) = Analysis of value stream mapping (VSM) on the production line mirror assy outer D17D PT Astra Komponen Indonesia (ASKI) / Dimas Setyo Wahyudi

Dimas Setyo Wahyudi; Lily Sudhartio, supervisor; Ratih Dyah Kusumastuti, examiner; Setyo Hari Wijanto, examiner ([Publisher not identified] , 2015)

 Abstrak

ABSTRAK
Ketidakseimbangan dalam pemerataan kerja di line produksi bisa menjadi masalah bagi organisasi ataupun perusahaan, proses produksi yang tidak efektif dan efisien menghasilkan pemborosan yang dibebankan sebagai biaya produksi. Lean manufacturing adalah pendekatan untuk mengefisienkan sistem dengan memahami gambaran sistem umum aktivitas produksi pada aliran informasi dan material di lantai produksi dan melibatkan perubahan, meningkatkan proses, produktivitas dengan mereduce waste didukung dengan budaya kerja 5S agar menciptakan suasana kerja yang kondusif.
Melalui penelitian ini, aktual proses produksi dipetakan kedalam sebuah peta ?VSM? (Value Strem Mapping) dan akan terlihat aktifitas produksi di dalam pembagian kerja manpower produksi pada masing-masing work station. Selanjutnya menentukan proses apa yang harus diperbaiki dengan menggunakan tools Failure Mode Effect Analysis (FMEA) dibandingkan dengan pencapaian target takt time, baru kemudian dilakukan poses perbaikan line balancing di area produksi assy outer mirror D17D.
Hasil dari penelitian menyarankan bahwa perusahaan harus merencanakan line balancing karena dapat mereduce bottle neck yang ada. Pencapaian target takt time dan peningkatan produktifitas di dalam line produksi assy outer mirror D17D akan dibuktikan di dalam penelitian ini.

ABSTRACT
Imbalance in task distribution in the production line could be a problem for the organization or company, ineffective and inefficien production process will generate waste which is charged as production costs. Lean manufacturing is an approach to streamline the system to understand overview of the general system of production activity on the flow of information and materials on the production floor and involves change, perbaiki processes, increase productivity with reduce waste supported by 5S workplace culture in order to create a conducive working atmosphere.
Through this study, the actual production process is mapped into a map "VSM" (Value Strem Mapping) and will be seen in production activities in the division of labor manpower production in each work station. Subsequently determine what process should be perbaikid by using the tools Failure Mode Effect Analysis (FMEA) compared to the achievement of the target takt time, and then carried out line balancing poses perbaikanin the production line area assy outer Mirror D17D.
Results of the study suggest that the company should plan line balancing because it can reduce existing bottle neck. Achievement of the target takt time and increase productivity in the production line assy outer mirror D17D will be proved in this study.

 File Digital: 1

Shelf
 T-Dimas Setyo Wahyudi.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2015
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xvi, 109 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T-Pdf 15-17-296185078 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20423537