:: UI - Tugas Akhir :: Kembali

UI - Tugas Akhir :: Kembali

Perancangan disaster recovery plan (DRP): Studi kasus Badan Pusat Statistik = The design of disaster recovery plan (DRP): Case study of BPS Statistics Indonesia

Fadhilla Permitasari; Setiadi Yazid, supervisor; Amril Syalim, supervisor; Yudho Giri Sucahyo, examiner; Rizal Fathoni Aji, examiner (Fakultas Ilmu Komputer Universitas Indonesia, 2016)

 Abstrak

Badan Pusat Statistik (BPS) merupakan salah satu instansi pemerintah yang memberi layanan publik. Layanan publik yang diberikan oleh BPS berupa penyajian data sensus dan survei. Dalam menjalankan fungsi untuk memberikan layanan publik ini, BPS didukung dengan teknologi informasi dan komunikasi (TIK). Pengelolaan TIK oleh instansi pemerintah diatur dalam Peraturan Pemerintah Republik Indonesia No. 82 Tahun 2012 tentang Penyelenggaraan Sistem dan Transaksi Elektronik. Dalam salah satu pasalnya yaitu pasal 17 ayat 1 dikatakan bahwa Penyelenggara Sistem Elektronik untuk pelayanan publik wajib memiliki rencana keberlangsungan kegiatan untuk menanggulangi gangguan atau bencana. Selain itu di pasal 20 dikatakan bahwa setiap penyelenggara sistem elektronik wajib memiliki prosedur dan mekanisme untuk pengamanan sistem elektronik. Namun, hingga saat ini, BPS belum memiliki rencana penanggulangan bencana yang memuat prosedur dan mekanisme untuk pengamanan sistem elektronik.
Saat ini, BPS sedang fokus dalam membangun disaster recovery center (DRC). Untuk menghadapi kondisi bencana diperlukan dokumen disaster recovery plan (DRP) yang menjelaskan prosedur penanganan bencana dan juga spesifikasi infrastruktur untuk DRC. Untuk memenuhi kebutuhan BPS tersebut, penelitian ini berusaha merancang dokumen rencana penanggulangan bencana atau disaster recovery plan (DRP) di BPS. Pengembangan DRP mengacu pada standar BCI Good Practice Guideline 2008 karena di dalam standar tersebut dijelaskan dengan rinci setiap tahap pengembangan beserta metode yang dapat digunakan.
Hasil dari penelitian ini adalah dokumen DRP yang sesuai dengan kebutuhan BPS. Dokumen tersebut memuat peran, tanggung jawab, prosedur, teknis penanganan bencana, strategi keberlangsungan bisnis serta perencanaan kapasitas perangkat TI untuk DRC. Dengan dibuatnya dokumen DRP tersebut, diharapkan pemulihan bencana dapat berjalan dengan baik, sehingga BPS dapat mempertahankan keberlangsungan bisnisnya jika terjadi bencana.

BPS-Statistics Indonesia is one of the government agencies that provides public services. Public services provided by BPS is census and survey data presentation. In carrying out the functions to provide these public services, BPS is supported by information and communication technology (ICT). ICT for government sector is regulated by Peraturan Pemerintah RI No. 82 Year 2012 on the Implementation System and Electronic Transactions. One article, namely article 17, paragraph 1 says that the Electronic System for public services shall have a continuity plan activities to cope with disruption or disaster. In addition, Article 20 says that every operator of electronic systems is required to have procedures and mechanisms for securing electronic systems. However, until now, BPS has not had a disaster plan that includes procedures and mechanisms for securing electronic systems.
Currently, BPS is focusing on building a disaster recovery center (DRC). To deal with catastrophic conditions are required disaster recovery plan (DRP) that describes the procedure for disaster management and infrastructure specifications for DRC. To meet the needs of the BPS, this study sought to design documents of disaster overcoming plan or disaster recovery plan (DRP) in BPS. DRP development refers to the standard BCI Good Practice Guidelines 2008 as the standard describes in detail every stage of development as well as methods that can be used.
Result of this research is DRP document in accordance with the needs of the BPS. The document contains the roles and responsibilities of each person, strategy for business continuity, procedures for handling the disaster as well as capacity planning for the DRC. DRP is expected to run well, so that BPS can maintain business continuity in case of disaster.

 File Digital: 1

Shelf
 TA-Fadhilla Permitasari.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : TA-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Ilmu Komputer Universitas Indonesia, 2016
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xiii, 99 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
TA-pdf 16-18-708296293 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20423861