:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Estimasi biaya konseptual pada proyek rusunawa untuk meningkatkan keakurasian dengan mengintegrasikan metode case-based reasoning dan analytical hierarchy process = Conceptual cost estimating in low-cost housing project to improve accuration using integrated method of case- based reasoning and analytical hierarchy process

Jennyvera; Yusuf Latief, supervisor; Wisnu Isvara, supervisor; Suratman, examiner; Ismeth Abidin, examiner; Alin Veronika, examiner (Fakultas Teknik Universitas Indonesia, 2013)

 Abstrak

Estimasi biaya konseptual merupakan hal yang fundamental dalam suatu proyek konstruksi. Estimasi ini menentukan kelayakan, evaluasi desain dan pendanaan proyek. Namun, kurangnya informasi dan gambar desain yang belum lengkap pada tahapan konseptual, membuat estimasi ini sulit untuk dilakukan. Penelitian ini mencoba membuat suatu permodelan estimasi biaya konseptual pada proyek rusunawa dengan mengintegrasikan metode Case-based reasoning (CBR) dan Analytical Hierarchy Process (AHP). Penelitian ini menggunakan 55 data historis proyek rusunawa yang tersebar di 19 kota di Indonesia pada tahun 2008 sampai 2011. Hasill penelitian ini menunjukkan bahwa metode CBR-AHP dapat menghasilkan permodelan estimasi biaya konseptual yang memiliki keakurasian yang baik dengan tingkat error rata-rata sebesar 2,88% dan dapat digunakan untuk mengestimasi biaya proyek rusunawa di masa mendatang.

Conceptual cost estimation plays an important role in the construction projects. This estimation will determine the project‟s feasibility, design evaluation and preliminary budget for a projects. However, due to the lack of information and incomplete construction drawings during the conceptual phase, the cost estimation becomes difficult task to do. This research aims to develop a conceptual cost estimation modeling in the low-cost housing projects using integrated method of Case-based reasoning (CBR) and Analytical Hierarchy Process (AHP). This study is conducted using 55 low-cost housing projects in 19 cities throughout Indonesia in year 2008 to 2011. The result shows CBR-AHP method can produce accurate model result with average testing error rates of 2,88% which can be used to predict low-cost housing projects cost later on.

 File Digital: 1

Shelf
 T45387-Jennyvera.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T45387
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2013
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xii, 108 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T45387 15-17-960583349 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20426744