:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Pengaruh ketentuan baru terhadap legalitas suatu kontrak bagi hasil: studi kasus pedoman tata kerja BP Migas No. 40 tahun 2010 terhadap kontrak migas di Indonesia = The impacts of new regulation to the legality of production sharing contract: a case study of BP Migas work procedures guidelines No. 40/2010 to oil and gas contract in Indonesia

Muhammad Rifqi; Suharnoko, supervisor; Akhmad Budi Cahyono, supervisor; Abdul Salam, examiner; Endah Hartati, examiner (Fakultas Hukum Universitas Indonesia, 2016)

 Abstrak

Skripsi ini membahas tentang pengaruh ketentuan baru yaitu Pedoman Tata Kerja BP Migas No. 40 Tahun 2010 tentang Abandonment and Site Restoration yang dikeluarkan setelah suatu Kontrak Bagi Hasil di tanda tangani dalam hal ini adalah Kontrak Bagi Hasil Blok C. Ketentuan baru ini dikeluarkan oleh badan pelaksana selaku pembuat peraturan dan juga pihak dalam kontrak. Ketentuan tersebut mengatur hal yang baru yaitu mengenai Penempatan Dana ASR dalam rekening bersama di bank dalam bentuk persero. Kontraktor dalam Blok C tidak mematuhi ketentuan tersebut, karena menganggap ketentuan tersebut tidak ada dalam kontrak yang mereka tanda tangani. Penelitian ini menggunakan bentuk penelitian yuridis normatif dengan tipologi deskriptif serta dengan menggunakan metode kualitatif. Hasil penelitian menyarankan bahwa Pedoman Tata Kerja BP Migas No. 40 Tahun 2010 harus tetap berlaku di Kontrak Bagi Hasil Blok C.

This thesis discusses the impacts of new regulation, BP Migas Work Procedure Guidelines No. 40/2010 concerning The Abandonment and Site Restoration, which has been issued after Production Sharing Contract of Block C was ratified. This regulation is issued by the implementing agency as a regulator and a party of the pertinent contract. This regulation stipulates a new provision that the contractor shall transfer abandonment and the site restoration fund to an escrow account in government bank. The Contractors in Block C do not comply with the regulation, because they consider that such regulation is not postulated in The Production Sharing Contract of Blok C. This study uses normative juridical approach with a descriptive typology and a qualitative method. The result thereof is to suggest that BP Migas Work Procedures Guidelines No.40/2010 shall be applied to The Production Sharing Contract of Block C.

 File Digital: 1

Shelf
 S64924-Muhammad Rifqi.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S64924
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Hukum Universitas Indonesia, 2016
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer (rdadontent)
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiii, 115 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S64924 14-18-154969870 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20430507