:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Analisis skema pembiayaan dan kelembagaan kerjasama pemerintah swasta (kps) pada rekayasa desain konseptual jalan tol trans Sumatera = Financial and institutional analysis based on public private partnership on conceptual design of trans Sumatera toll road project

Robby Panji Abdu Tsani; Mohammed Ali Berawi, supervisor; Ayomi Dita Rarasati, examiner; Setyo Supriyadi Sipadi, examiner (Fakultas Teknik Universitas Indonesia, 2016)

 Abstrak

Proyek Jalan Tol Trans-Sumatera (JTTS) direncanakan dibangun sepanjang 2.732 kilometer dari Aceh hingga Lampung dan diperkirakan menelan biaya sebesar Rp. 330 triliun. Rekayasa nilai tambah dilakukan pada Proyek JTTS dengan menambahkan enam fungsi, yaitu integrasi jalur sepeda motor, pengembangan rest area, integrasi dry port, integrasi kereta median tol, pengembangan area pariwisata dan penambahan jaringan fiber optik. Penelitian ini bertujuan mendefinisikan jenis skema pembiayaan dan skema kelembagaan Kerjasama Pemerintah Swasta pada Proyek JTTS.
Analisis skema pembiayaan dilakukan melalui pengembangan berbagai skenario terhadap pembagian antara penyediaan dana dari pemerintah dan swasta pada tahap biaya konstruksi (initial cost), biaya pemeliharaan (operation & maintenance cost) dan pembagian pada pemasukan dana dari pengguna (revenue). Dari 36 skenario yang dihasilkan didapatkan skema pembiayaan dengan Initial Cost Sharing pemerintah 60 % dan swasta 40 %, Operation and Maintenance Sharing pemerintah 50 % dan swasta 50 %, dan Revenue Sharing pemerintah sebesar 50 % dan swasta 50 % yang dapat menghasilkan IRR 12,86 %, serta dihasilkan skema kelembagaan dengan membentuk Joint Venture.

Trans Sumatera Toll Road Project (JTTS) planned to be built along 2,732 kilometers from Aceh toLampung and is estimated to cost Rp. 330 trillion. Value Engineering is conducted at the project by adding six functions, which are integration of the motor bike paths, rest area development, the integration of the dry port, rail integration highway median, the development of tourism area and the addition of a fiber optic network The study aims to determine the optimal financing scheme and ideal institutions scheme based on Public-Private Partnership of JTTS Project.
Analysis financing scheme involves by dividing the assuming scenario between the provision of funds from the government and private sectors at the stage of initial cost, operation & maintenance cost, and revenue sharing funds from the user. From 36 scenarios, a financing scheme with government Initial Cost Sharing 60% and 40% private, Operation and Maintenance Sharing 50% government and 50% private, and Revenue Sharing governments and the private sector by 50% to 50% with the IRR of 12.86%, and institutional scheme obtained by forming a Joint Venture.

 File Digital: 1

Shelf
 S65524-Robby Panji Abdu Tsani.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S65524
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2016
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xv, 165 pages : illustration ; 30 cm + appendox
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S65524 14-18-866992137 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20431224