Identifikasi faktor-faktor dominan dalam proses pelelangan yang mempengaruhi besar jaminan penawaran pada proyek konstruksi di Indonesia = The identification of dominant factors in tender process that affect the amount of bid bond in Indonesian s construction project

Nico Yudianto; Yusuf Latief, supervisor; Rully Andhika, supervisor; Bambang Setiadi, examiner; Setyo Supriyadi Sipadi, examiner; Samudra Gunadharma, examiner ([Publisher not identified] , 2016)

 Abstrak

ABSTRAK
Jaminan penawaran merupakan faktor kontrol yang sangat penting untuk proses pelelangan. Fungsi jaminan penawaran adalah untuk mengganti besar biaya pelelangan apabila harus dilakukan tender ulang. Di beberapa negara besar jaminan penawaran sangat bervariasi, mulai dari 1% hingga 25%. Menurut Nugent, jaminan penawaran diperhitungkan untuk mengganti biaya retender akibat kesalahan peserta. Penelitian ini membahas tentang faktor-faktor dominan dalam proses pelelangan yang akan mempengaruhi besar jaminan penawaran di Indonesia, dikarenakan sistem pelelangan di Indonesia yang sudah beralih dari manual ke pengadaan elektronik. Dalam penelitian ini digunakan metode Relative Importance Index untuk mengetahui indikator apa saja yang dominan, dan hasilnya adalah kompleksitas proyek, jumlah personel, lama waktu pelelangan, pembuatan HPS/OE, sanggahan banding, pembuktian kualifikasi, evaluasi dokumen tahap I dan evaluasi dokumen tahap II merupakan 8 indikator paling dominan yang mempengaruhi besar jaminan penawaran di Indonesia.

ABSTRACT
Bid bond is one of the important factors to control the tender process. It also to cover retender cost if necessary. In some countries, the amount of bid bond is vary, starting from 1% to 25%. According to Nugent, this amount is calculated to cover retender cost due to error from participants. This research is focus to analyze dominant factors in tender process that could affect the amount of bid bond in Indonesia, due to changing procurement system in Indonesia from manual method to electronic procurement method. This study uses Relative Importance Index to identify the dominant factors with the result of 8 most dominant factors that will affect the amount of bid bond are project complexity, number of personel, length of tender process, calculate Owner Estimate, the objection appeal, qualification verification, document evaluation phase I and phase II .

 File Digital: 1

Shelf
 S64107-Nico Yudianto.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S64107
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2016
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated (rda media); computer (rda media)
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xvi, 147 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S64107 14-18-428392724 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20431646