ABSTRAK Di Indonesia turunnya harga minyak pada pertengahan tahun 2014 ditambahdengan semakin menurunnya produksi minyak dan gas bumi karena penurunanalamiah dari lapangan-lapangan tua membuat operator-operator PSC (ProductionSharing Contract) menganalisa kembali keekonomian dari pabrik-pabrikpengolahan minyak dan gas bumi mereka. Kajian ini bertujuan untuk menganalisakeputusan penutupan pabrik LPG beserta aspek teknis dan finansial yangberkaitan dengan penutupan tersebut.Hasil kajian finansial menunjukkan bahwa pabrik LPG yang sudah beroperasiselama 40 tahun ini terbukti tidak ekonomis lagi untuk tetap dioperasikan. Nilaiforecast dari sensitivitas analisis juga menunjukkan bahwa kemungkinan untukreaktivasi pabrik LPG ini di masa depan sangat kecil sehingga perlu di lakukanpreservasi terhadap pabrik LPG hingga kontrak kerja berakhir. Kajian kelayakanoperasi juga menunjukkan bahwa kenaikan 1,5 MMSCFD dari gas alam yangtidak diolah pabrik LPG yang dialirkan menuju kompresor tingkat 2 tidakmengakibatkan kenaikan vibrasi pada kompresor tersebut yang dapat menggangguoperasi penyaluran gas alam ke LNG Bontang dan East Kalimantan Pipeline ABSTRACT In Indonesia the decline in oil prices in mid 2014 coupled with the decline in oiland gas production due to the natural decline of old fields makes operators PSCreanalyzed the economics of their processing factories. The less economicalprocessing of natural gas that is processed into LPG requires the company tookthe decision to shut down its LPG plant . This study aims to analyze the decisionto shut down the LPG plant along with technical and financial aspects related tothe closure.Financial results of the study showed that the LPG plant that has been operatingfor 40 years has proved no longer economical to remain in operation. Forecastvalue of the sensitivity analysis also showed that the possibility for thereactivation of the LPG plant in the future is so small so that the company needsto conduct preservation procedure of the LPG plant until the expiration of thecontract . Operating feasibility study also shows that an increase of 1.5 MMSCFDof natural gas untreated to the compressor will not resulting in increased levels ofvibration in the compressor which can interfere with the operation of natural gassupply to Bontang LNG and East Kalimantan Pipeline . |
T45776-Agung Graha Putra.pdf :: Unduh
|
No. Panggil : | T45776 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | [Place of publication not identified]: [Publisher not identified], 2016 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online source |
Deskripsi Fisik : | xiii, 102 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T45776 | 15-17-570151537 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20432475 |