ABSTRAK
Keterlambatan pengajuan klaim BPJS berakibat pada turunnya cashflow rumah
sakit. Proses klaim saat ini berjalan tidak efisien dan efektif. Tujuan dari
penelitian ini adalah mendapatkan hasil analisis dan usulan perbaikan alur proses
dokumen klaim BPJS pasien rawat jalan dengan menerapkan konsep Lean
Hospital. Penelitian dengan pendekatan kuantitatif dan kualitatif ini
mengobservasi waktu yang dibutuhkan untuk menyelesaikan dokumen klaim
sebelum diberikan kepada verifikator BPJS serta melakukan wawancara
mendalam, observasi proses, dan telaah dokumen. Hasil penelitian menunjukkan
terjadi waste terbesar di unit mobilisasi dana yaitu selama 32,5 hari 18,8 menit
dalam penyelesaian dokumen klaim. Jenis waste terbanyak adalah waiting dan
transportation. Berdasarkan VSM diketahui Lead Time dari proses klaim saat ini
adalah 33,9 hari. Usulan perbaikan yang diberikan dari penelitian ini adalah
dengan optimalisasi tim Casemix yang baru saja dibentuk, sehingga lead time
pengerjaan klaim yang dibutuhkan menjadi 6,44 menit. Standardisasi kerja dan
penilaian kinerja berupa KPI, IKI, dan IKU dinilai perlu diterapkan agar kinerja
petugas menjadi optimal.

ABSTRACT
Delay in the submission of BPJS claims resulted in decreasing hospital cash flow. The current
claim process is not efficient and effective.The objective of this reseach is to analize and propose improvement in the claim process by applying Lean Hospital concept. This research used quantitative and qualitative approaches to observed the time required to complete the claim process before submitted to the BPJS verificator and also have an in-depth interview, observe the
process, and document review. The result showed most waste happened in mobilisasi dana unit for 32.5 days 18.8 minutes in the settlement BPJS document claims. Based on Value Stream Mapping, Lead Time of the claim process at this time is 33.9 day. Most types of waste are waiting and transportation. Proposed improvement provided from the study is to optimizing the casemix team which newly formed. By optimizing the casemix team, Lead Time required to complete the claims process is 6.44 minutes. Standardize work and performance appraisal (KPI, IKI, and IKU) consider to apply to reach employee best performance.

 File Digital: 1

Shelf
 T46652-Nilandari.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T46652
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2016
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xix, 182 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T46652 15-18-234905868 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20433532