Evaluasi sistem manajemen mutu proyek EPC dalam fase engineering produk detail engineering berbasis manajemen risiko pada PT. XYZ (studi kasus proyek boiler tank) = Evaluation of quality management system EPC project in engineering phase for detail engineering product based on risk management at PT XYZ (case study boiler tank project) / Shinta Theresia Manullang
Manullang, Shinta Theresia;
Yusuf Latief, supervisor; Leni Sagita Riantini, examiner; Eddy Subiyanto, examiner; Setyo Supriyadi Sipadi, examiner
([Publisher not identified]
, 2016)
|
ABSTRAK Tesis ini membahas mengenai evaluasi yang dilakukan mahasiswa terhadapsistem manajemen mutu proyek EPC pada fase perancangan produk detailengineering yang dikerjakan PT XYZ dengan berbasis manajemen risiko. Tujuandari penelitian ini adalah untuk mengetahui faktor-faktor dominan yangmempengaruhi sasaran mutu fase engineering produk detail engineering.Penelitian ini dilakukan dengan meneliti aktifitas-aktifitas yang dilakukan padaproses bisnis dari PT XYZ. Faktor-faktor risiko yang mempengaruhi kinerja mutukemudian dianalisis dengan metode SPSS serta risk management.Hasil dari penelitian ini menunjukkan bahwa terdapat 16 faktor-faktor risikodominan (dengan kategori risiko sedang dan tinggi) yang dapat mempengaruhikinerja mutu produk proyek EPC pada PT XYZ (studi kasus proyek boiler tank),dengan risiko tertinggi yaitu X13 dan X37. ABSTRACT This thesis discuss about the student?s evaluation of quality management systemof detail engineering at EPC project at PT XYZ in the design phase ? based onrisk management. The purpose of this research is to knowing dominant factorwhich can influence the quality performance of PT XYZ. This research conductsby examine each activities in the business processes of PT XYZ. Based on thoseactivities, student has found the risk factors which influence the qualityperformance of detail engineering?s product that has been produced by PT XYZ.The outcome of this research shown there is 16 factors which can influence thequality performance (medium and high category) of EPC project?s products by PTXYZ (case study boiler tank project), and the highest risks are X13 and X37. |
T46817-Shinta Theresia Manullang.pdf :: Unduh
|
No. Panggil : | T46817 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | [Place of publication not identified]: [Publisher not identified], 2016 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xviii, 192 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T46817 | 15-18-770646341 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20433801 |