:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Analisis Alokasi Risiko Pada Stakeholder Di Proyek Mass Rapid Transit Jakarta Tahapan Konstruksi = Analysis Of Risk Allocation Of Stakeholders On Mass Rapid Transit Jakarta Project In Construction Phase

Marendra Uka Ermaya; Ayomi Dita Rarasati, supervisor; Petroceany, Jade Sjafrecia, supervisor; Leni Sagita Riantini, examiner; Yusuf Latief, examiner (Fakultas Teknik Universitas Indonesia, 2016)

 Abstrak

ABSTRAK
Penelitian ini membahas tentang pengalokasian berbagai macam risiko pada stakeholder terkait seputar proyek yang mana diambil contoh proyek Mass Rapid Transit Jakarta pada tahapan konstruksi proyek dimana dalam proyek ini terdapat keterlambatan dalam penyelesaiannya dikarenakan alokasi risiko yang tidak tepat. Penelitian ini adalah penelitian kualitatif dengan desain deskriptif. Pengalokasian risiko perlu dilakukan untuk mengetahui tanggung jawab tiap stakeholder terhadap risiko terkait yang mana bila tidak dialokasikan pada stakeholder yang tepat akan membuat proyek terhambat. Penelitian ini menggunakan metode delphi dan survei menggunakan kuesioner. Setelah dilakukan analisa dan validasi didapatkan masing-masing risiko yang muncul dengan para stakeholder utama yang menanggungnya dengan mayoritas risiko ditanggung oleh pihak kontraktor.

ABSTRACT
This paper discusses the allocation of various types of risk on relevant stakeholders about the project which were sampled on Jakarta Mass Rapid Transit project in the construction phase of the project where in this project, the time to finished the project has delayed because of risk allocation is not proper. This study is a qualitative research with descriptive design. The allocation of risk needs to be done properly to determine the responsibilities of each stakeholder to the associated risks which if not allocated to the appropriate stakeholders will make the project impeded. This study use Delphi method and questionnaire survey. After being analyzed and validated, we obtain emerging risks with the key stakeholders who bear the risk with the majority of the risk is borne by the contractor.

 File Digital: 1

Shelf
 S66410-Marendra Uka Ermaya.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S66410
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2016
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiv, 154 page ; ill. : 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S66410 14-17-316215910 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20444222