:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Analisis biaya siklus hidup PLTU dengan metode weibull untuk peningkatan faktor ketersediaan pembangkit = Coal fired power plant s life cycle cost analysis using weibull methods to increase the availability factor / Hery Wahyudi Wibowo

Hery Wahyudi Wibowo; Iwa Garniwa M.K., supervisor; I Made Ardita Y., examiner; Amien Rahardjo, examiner; Chairul Hudaya, examiner ([Publisher not identified] , 2016)

 Abstrak

Setiap pembangkit memiliki karakteristik umur hidup yang diharapkan mampu berkelanjutan hingga waktu kontrak yang telah disepakati sebelumnya. Untuk dapat berkelanjutan, pembangkit perlu dilakukan perbaikan maupun penggantian peralatan yang terindikasi telah mengalami penurunan kinerja. Dengan distribusi Weibull didapatkan koefisen siklus hidup peralatan sub sistem pembangkit yang kemudian disimulasikan dengan Monte Carlo bermanfaat dalam pengambilan keputusan manajemen pengoperasian dan pemeliharaan PLTU. PLTU Lontar menjadi salah satu pembangkit yang menggambarkan dari kondisi pembangkitan tenaga listrik di system Jawa Bali dengan faktor kapasitas sebesar 48,84 dan faktor ketersediaan sebesar 53,77 . Dari hasil perbandingan beberapa skenario menunjukkan bahwa dengan tindakan perbaikan dapat meningkatkan faktor ketersediaan hingga 77,66 dan IRR sebesar 19.02 .
Power plant has a characteristic life cycle which is expected to sustain until the contract that has been agreed in advance. To be sustainable, power plant needs to necessary repair or replacement of equipment which is indicated has experienced a decline in performance. Weibull distribution is used to determine life cycle coefficient of the equipment sub generating system. Monte Carlo simulation then performed to achieve economic feasibility. Lontar power plant became one of the plants that describe the condition of the steam power plant in the Java Bali system with a capacity factor of 48.84 and 53.77 of availability factor. From the comparison of multiple scenarios indicate that the corrective actions can increase the availability of power plant up to 77.66 and an IRR of 19,02 .

 File Digital: 1

Shelf
 T-Hery Wahyudi Wibowo.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2016
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xiii, 138 pages: illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T-Pdf 15-19-234650494 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20445624