:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Pengembangan sistem administrasi dan dokumentasi klaim pada proyek konstruksi: studi kasus PT X = Development administration systems and claims documentation on construction projects : case study PT X

Hegar Adrian; Ayomi Dita Rarasati, supervisor; Kemala Hayati, supervisor; Leni Sagita Riantini, examiner; Setyo Supriyadi Sipadi, examiner; Herawati Zetha Rahman, examiner (Fakultas Teknik Universitas Indonesia, 2017)

 Abstrak

Seiring dengan pertumbuhan ekonomi Indonesia yang semakin meningkat sehingga banyak diselengarakan proyek konstruksi dengan skala besar, semakin besar suatu proyek maka akan semakin komplek pekerjaannya. Proyek konstruksi sangat erat dengan berbagai risiko perubahan yang memungkinan untuk terjadinya konflik. Untuk menghindari sengketa atas konflik yang terjadi karena adanya perubahan, sangat penting bagi kontraktor untuk mengajukan klaim dengan langkah-langkah yang ditentukan sesuai dengan kondisi kontrak. Proses improvisasi pelaksanaan klaim pada penelitian ini disini berupa pengembangan sistem administrasi dan dokumentasi klaim pada proyek konstruksi.
Metode yang digunakan pada penelitian ini berupa studi kasus penanganan klaim proyek konstruksi di PT X dengan menganalisa faktor-faktor dominan pada klaim proyek konstruksi yang didapatkan dari penelitian terdahulu serta jurnal-jurnal internasional. Faktor-faktor tersebut dianalisa lebih lanjut dengan metode Interpretive Structural Modeling (ISM) yang bertujuan untuk mendapatkan hubungan antara masing-masing faktor sehingga didapatkan suatu model proses setiap indikator klaim, hasil dari analisa ISM berupa diagram hubungan antara masing-masing variabel dari setiap indikator, antara lain: identifikasi klaim, perencanaan klaim, penyajian klaim, administrasi klaim dan dokumentasi klaim, yang dikembangkan menjadi Standar Operasional Prosedur (SOP) Klaim di PT X yang berguna untuk membantu kontraktor/penyedia jasa dalam pengajuan klaim, agar klaim yang mereka ajukan bisa diterima oleh pengguna jasa/owner.

Along with Indonesia's economic growth increased in line which held by largescale construction projects , the bigger of scale of the project will increase the complexity of work, with the result of project construction loaded with a variety of risk changes that allow for conflict, to avoid disputes over the conflict because the change, it is important for contractors to make a claim under the measures determined in accordance with the conditions of the contract. The improvement claims process in this research is the development of administrative systems and documentations claim in construction project.
The method used is a case study of handling claims on construction projects at PT X by analyze domain factors claim on construction project which got from previous research and international journals. The factors will be analyzed using Interpretive Structural Modeling (ISM) method to obtain the relationship between these factors, so the result is a proces model every claim indicator the results of the analysis ISM in the form of a flowchart between each of the variables of each indicator, among others: identification of claims, claims planning, presentation of claims, claims administration and claims documentation, developed into Standard Operating Procedure (SOP) Claims in PT X that help contractors in claims submission,in other their claim can be accepted by owner.

 File Digital: 1

Shelf
 T49808-Hegar Adrian.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T48908
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2017
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xix, 140 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T48908 15-18-237045054 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20454193