Pengembangan standar wbs (work breakdown structure) untuk perencanaan kualitas pekerjaan arsitektur bangunan tinggi berbasis risiko = Development of risk based standardized wbs (work breakdown structure) for quality planning of high rise building architectural works
Mirradewi Rianty;
Yusuf Latief, supervisor; Suratman, supervisor; Leni Sagita Riantini, examiner; Eddy Subiyanto, examiner; Afrizal Nursin, examiner
(Fakultas Teknik Universitas Indonesia, 2017)
|
Work Breakdown Structure WBS adalah perincian deliverable dan pekerjaan proyek menjadi komponen yang lebih kecil sehingga dapat dikelola lebih baik. Meskipun setiap proyek unik, kebanyakan bangunan dapat distandarisasi kegiatannya sehingga memungkinkan penyediaan dasar perkiraan yang lebih kuat untuk pengelolaan proyek. Dalam pengelolaan proyek, kinerja kualitasnya juga penting untuk dikontrol dan pendekatan pertimbangan risiko sekarang disyaratkan untuk keseluruhan proses manajemen mutu dalam perkembangan ISO 9001. Pekerjaan finishing atau arsitektur merupakan pekerjaan yang paling sering mengalami rework atau ketidaksesuaian hasil dengan spesifikasi dibanding pekerjaan lainnya dalam proyek. Pada Oleh karena itu, pengembangan WBS berbasis risiko diusulkan. Tujuan penelitian adalah untuk mengembangkan WBS berbasis risiko untuk perencanaan kualitas pekerjaan arsitektur bangunan tinggi. Penelitian yang dilakukan terdiri dari beberapa tahap dengan metode analisis risiko kualitatif. Hasil penelitian menunjukkan WBS standar terdiri dari 5 level utama dan 2 level pelengkap, dengan 14 variabel risiko dominan terhadap kinerja kualitas proyek, dan rekomendasi respon risiko sebagai pengembangan WBS standar. Work Breakdown Structure WBS is a breakdown of deliverables and project work into smaller components so it can be better managed. Although each project is unique, most buildings can be standardized in their activities so as to enable the provision of a stronger forecast basis for project management. In project management, quality performance is also important to be controlled and a risk consideration approach is now required for the overall quality management process in the development of ISO 9001. Finishing or architectural work has the most frequent degree of rework compared to other work in the project, it is the non conformity with specifications. Therefore, the development of risk based WBS is proposed. The objective of the study was to develop risk based WBS for high quality building architectural work planning. The research consisted of several stages with qualitative risk analysis method. The result indicate that standardized WBS consists of 5 primary level and 2 complementary level, with 14 dominant risk variables on quality performance, and recommended risk responses as the development. |
T48741-Mirradewi Rianty.pdf :: Unduh
|
No. Panggil : | T48741 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Teknik Universitas Indonesia, 2017 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xx, 499 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T48741 | 15-18-741520660 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20454352 |