Analisis kelayakan investasi transmisi interkoneksi PLN dengan PLTU Kilang Pertamina RU VI Balongan = Transmission investment analysis of interconnection of PLN and Steam Power Plant of Pertamina RU VI Balongan
Mario Wirya;
Chairul Hudaya, supervisor; Uno Bintang Sudibyo, supervisor; Amien Rahardjo, promotor; Agus R. Utomo, examiner
([Publisher not identified]
, 2017)
|
ABSTRAK Keandalan suplai listrik pada proses kilang adalah sangat penting. Oleh sebab itusering diterapkan prinsip Maintain Reliability at any Cost. Hal ini juga berlakupada studi yang dilakukan di kilang Pertamina RU VI Balongan. DimanaBalongan memiliki potensi kelebihan daya listrik yang dapat dimanfaatkan.Pemanfaatan kelebihan daya ini dapat dilakukan dengan interkonesi ke jaringan70kV PLN yang diharapkan dapat menambah keandalan suplai listrik di kilangPertamina RU VI Balongan. Dalam membangun interkonksi diperlukan modalyang dalam penelitian ini dibayai oleh swasta dengan skema BOT, dan dibangunskema model untuk menilai kelayakan ivestasi. Metode probabilitas dengansimulasi Monte Carlo digunakan dalam permodelan dengan menggunaknasoftware Crystal Ball, sedangkan perhitungan parameter teknis menggunakanPower System Simulation ETAP 16.0. Dari hasil penelitan ditemukaninterkoneksi dengan jaringan PLN dapat meningkatkan index keandalan (LOLP)menjadi 0.15 hari pertahun. Dari hasil analisis keekonomian investasimenguntungkan jika harga jual listrik (Rp/kWh) lebih besar 10% dari biaya pokokproduksi (Rp/kWh) dengan tingkat keyakinan 60%. ABSTRACT Reliable supply is a must in refinery operation. That is mainly the reasonMaintain Reliability at any cost were used. This method was using in RefineryPertamina RU VI Balongan. Refinery Pertamina RU VI S is potential excesspower to be used. This potential can be implemented by connection with 70kVPLN which probably increase reliability of the system. To build theinterconnection, transmission line is needed which in this research was foundedby third party (independent) with BOT business scheme. This tesis propose is tobuild the model for investment analysis from third party perspective. Probabilitymethod with Monte Carlo Simulation was used with Crystal Ball Software, whilefor technical parameter Power System Simulation ETAP 16.0 was used. From thisresearch is found reliability with LOLP index will increase to be 0,15 day/ yearWhile in economic analysis is found that the investment will get the profit ifselling rate is 10% higher than production cost per kWh with 60% certainty. |
T48898-Mario Wirya.pdf :: Unduh
|
No. Panggil : | T48898 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | [Place of publication not identified]: [Publisher not identified], 2017 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | vi, 76 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T48898 | 15-17-918029699 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20454355 |