Analisis privatisasi pembangkit listrik tenaga uap labuhan angin 2x115 MW = Privatization analysis of labuhan angin 2x115 MW coal fired steam power plant

Dwi Laksmana; I Made Ardita Y., supervisor; Uno Bintang Sudibyo, supervisor; Chairul Hudaya, examiner; Ridwan Gunawan, examiner (Fakultas Teknik Universitas Indonesia, 2017)

 Abstrak

Dalam rangka mengatasi permasalahan kebutuhan energi atau listrik di Indonesia khususnya di wilayah regional Sumatera, Pemerintah telah mengambil langkah darurat dengan cara membangun MPP Mobile Power Plant dan menyewa MVPP Marine Vessel Power Plant . Melalui langkah strategis ini, cadangan daya listrik yang sebelumnya 15 pada tahun 2016 naik menjadi 32 di tahun 2017. Dalam jangka panjang, pemerintah tetap melanjutkan program 35.000 MW dengan memperkuat peran IPP Independent Power Producer baik PLTU berbahan bakar batu bara maupun bahan bakar diesel/gas. Untuk menurunkan biaya pokok penyediaan, Pemerintah berusaha menaikkan prosentase bahan bakar batu bara hingga tercapai target bauran energi. Langkah yang ditempuh oleh Pemerintah adalah memperpanjang masa ekonomis suatu PLTU maupun menambah PLTU baru. Sebuah pembangkit dapat melakukan mid-life refurbishment untuk mempertahankan kapasitas, efisiensi dan menjaga keandalan mesin. Keputusan untuk melakukan life-extension atau menutup/ menghentikan suatu pembangkit memerlukan kajian untuk mencari solusi optimal antara opsi life-extension dan membangun pembangkit baru. Pada tesis ini akan diperhitungkan opsi revitalisasi PLTU Labuhan Angin menggunakan skema privatisasi maupun secara mandiri oleh PLN. Pada tesis ini didapatkan kesimpulan bahwa pilihan privatisasi dengan metode perhitungan Discounted Cash Flow dihasilkan harga jual listrik lebih rendah dibandingkan pilihan revitalisasi secara mandiri.

To overcome the lack of electrical energy in Indonesia, especially in the region of Sumatra, the Government has taken emergency measures by building MPP Mobile Power Plant and leasing MVPP Marine Vessel Power Plant . Through this strategic move, the power reserves of 15 in 2016 rose to 32 in 2017. In the long term, the government continues the 35,000 MW program by strengthening the role of IPP Independent Power Producer both coal fired power plant and materials Diesel fuel gas. To reduce the cost of supply, the Government tries to increase the percentage of coal fuel until it reaches the target of energy mix. The steps taken by the Government are extention the economic life of a steam power plant or adding new steam power plant. A plant can treats mid life refurbishment to maintain capacity, efficiency and maintain engine reliability. The decision to do a life extension or shut down a plant requires a study to find the optimal solution between life extension options and build a new plant. This paper will take into account the revitalization of SPP Labuhan Angin using privatization scheme or independently by PLN. This paper concluded that the choice of privatization by Discounted Cash Flow method generated lower electricity selling price than the option of independent revitalizaation.

 File Digital: 1

Shelf
 T47933-Dwi Laksmana.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T47933
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2017
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xii, 68 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T47933 15-21-323580573 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20454543