Analisis tingkat kematangan budaya keselamatan sektor konstruksi di PT. MK proyek renovasi Stadion Utama Gelora Bung Karno = Analysis of safety culture maturity level in construction at PT. MK Gelora Bung Karno main stadium renovation project
Marina Kartikawati;
Zulkifli Djunaidi, supervisor; Dadan Erwandi, examiner; Ridwan Zahdi Sjaaf, promotor; Wawan Irawan, examiner; Lorencius Kukuh Prabowo, examiner
([Publisher not identified]
, 2017)
|
ABSTRAK Nama : Marina KartikawatiProgram Studi : Magister Keselamatan dan Kesehatan KerjaJudul : Analisis Tingkat Kematangan Budaya Keselamatan SektorKonstruksi di PT. MK Proyek Renovasi Stadion Utama Gelora BungKarnoLatar Belakang : Budaya keselamatan tidak hanya berpengaruh kepadaproduktivitas namun juga persaingan antar usaha yang sejenis. Konsep budayakeselamatan merupakan sebuah konsep baru di sektor konstruksi yang memilikikarakteristik tenggang waktu penyelesaian yang sempit serta tingginya angkapergantian pekerja. PT. MK. Departemen Gedung memenangkan tender atasProyek Renovasi Stadion Utama Gelora Bung Karno dengan jangka waktu proyekselama 14 bulan Choudhry et al. 2007 Cooper 2002 .Tujuan : Penelitian ini bertujuan untuk mengetahui tingkat kematangan budaya diPT. MK pada proyek Renovasi Stadion Utama Gelora Bung Karno SU-GBK .Metode : Metode pengambilan data secara kualitatif FGD, observasi danwawancara mendalam dan diolah dengan metode kuantitatif untuk kemudiandilakukan analisis secara mendalam indepth analysis pada bulan Mei-Juli 2017.Sampel dalam penelitian ini dipilih dengan stratified random sampling yangditentukan berdasarkan representasi di dalam populasi.Hasil : PT. MK Proyek Renovasi SU-GBK menitik beratkan perhatian kepadaperencanaan sistem, namun persepsi dalam implementasi dan evaluasi sistemmanajemen keselamatan masih memiliki nilai yang rendah. Manajemen dalamproyek telah menyadari pentingnya manusia dalam sebuah pekerjaan. Manusia /pekerja adalah aset penting bagi perusahaan. Namun hal ini belum dirasakan olehsebagian besar pekerja karena nilai yang tinggi terdapat pada level manajemen danpengawas. Kesadaran akan keselamatan yang dibangun oleh para pemimpin proyek manajemen dan pengawas masih dalam tahapan awal namun keselamatan kerjabelum tercermin dalam keseharian / daily activities di proyek ini karena masihdalam tahapan menata organisasi.Kesimpulan : Tingkat kematangan budaya keselamatan di PT. MK ProyekRenovasi Stadion Utama Gelora Bung Karno SU-GBK dapat dikategorikan kedalam tingkat kalkulatif dengan rata-rata nilai adalah 3,19. Sistem manajemenkeselamatan berjalan didasarkan data yang ada dengan kendali penuh padamanajemen tanpa partisipasi aktif dari pekerja. Organisasi dengan level kalkulatifmerupakan organisasi yang belum siap dalam menjalankan budaya keselamatan.Kata Kunci : Budaya Keselamatan, Konstruksi, Keselamatan Kerja ABSTRACT Name Marina KartikawatiMajor Occupational Health and SafetyTitle Analysis of Safety Culture Maturity Level in Construction at PT. MKGelora Bung Karno Main Stadium Renovation ProjectBackground Safety culture not only affects to productivity but also to competitionbetween similar core businesses. The concept of safety culture is a new concept inthe construction sector. Construction sector has a narrow building period and highemployee turnover. PT. MK Building Departement won the tender for theRenovation of Gelora Bung Karno Main Stadium with 14 months term. Choudhryet al. 2007 Cooper 2002 Aim This study aims to determine the level of cultural maturity in PT. MK on theRenovation Project of Gelora Bung Karno Main Stadium SU GBK .Method Data collected qualitatively FGD, observation and in depth interview and processed by quantitative method for indepth analysis in May July 2017. Thesample in this study was chosen by stratified random sampling and determined byrepresentation in population.Result PT. MK SU GBK Renovation Project focuses on system planning, butimplementation and evaluation of the safety management system still has low value.Project rsquo s managements have realized the importance of humans in a system.Workers are important asset for the company. The awareness of the safety built byproject leaders management and supervisors is still in the early stages and has notbeen felt by most workers. Safety is not reflected in daily activities. This projectstill is organizing the organization.Conclusion The safety culture maturity level in PT. MK SU GBK project can becategorized into calculative level with average value is 3.19. The safetymanagement system runs based on existing data. It fully controled by managementwithout the active participation of workers. Calculative level organization is anorganization that is not ready for the safety culture.Keywords Safety Culture, Construction, Safety |
T-Marina Kartikawati.pdf :: Unduh
|
No. Panggil : | T-Pdf |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | [Place of publication not identified]: [Publisher not identified], 2017 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | computer |
Tipe Carrier : | online resource |
Deskripsi Fisik : | xiv, 98 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T-Pdf | 136-18-519561341 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20456014 |