Analisis rancangan jaringan kerja proses pembangunan konstruksi lambung kapal untuk menentukan jalur kritis pada pembangunan kapal tugboat = Analysis of network planning of hull construction development working process for determining critical path in tugboat ship construction

Tashia Ega Maharani; Talahatu, Marcus Alberth, supervisor; Mukti Wibowo, supervisor; Sunaryo, examiner; Agus Sunjarianto Pamitran, examiner; Muhammad Arif Budiyanto, examiner; Henky Suskito Nugroho, examiner (Universitas Indonesia, 2017)

 Abstrak

Network Planning atau juga yang biasa disebut dengan jaringan kerja, merupakan salah satu metode perencanaan untuk pembangunan atau sebuah proyek. Metode perencanaan ini diterapkan pada proses pembangunan kapal tugboat jenis harbour tug. Tujuan penelitian ini adalah untuk mengetahui seberapa lama waktu proses produksi konstruksi lambung kapal dan mengetahui jalur kritis yang ada, agar dapat mengantisipasi keterlambatan pembangunan kapal. Data yang diperoleh dengan melakukan pengamatan lapangan, wawancara kepala proyek dan juga mempelajari proses pembangunan pada master schedule yang telah ada. Data yang telah ada diolah menggunakan diagram network dan menggunakan metode jalur kritis. Sehingga data yang diperoleh adalah proses pengerjaan proses konstruksi kapal untuk waktu pengerjaannya selama 141 hari dan terjadinya jalur kritis mulai pada proses pembangunan konstruksi lambung kapal untuk proses blok DB1. Pada proses pembangunan proyek DB1, Jalur kritis ini adalah sebagai salah satu antisipasi keterlambatan untuk pengerjaan kegiatan selanjutnya seperti pada proses pengerjaan erection,bilge keel, dan welding check parsial.

Abstract Network Planning or also commonly referred to as a network, is one method of planning for a development or a project. This planning method is applied to the development process of harbor tug type. The purpose of this study is to find out how long the production process of hull construction and to know the critical path time, in order to anticipate the delay of ship building. Data obtained by conducting field observations, project head interviews and also studying the development process on existing master schedule. Existing data is processed by using a network diagram and the critical path method. So, the data which obtained is the process of ship contruction for during time of 141 days. And the critical path occur at the process of hull construction for DB1 process. At the DB1 process, critical path is as one of delay anticipation for the futher activity such as erection,bilge keel, and welding check partial.

 File Digital: 1

Shelf
 S68202-Tashia ega maharani .pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S68202
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Universitas Indonesia, 2017
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xv, 61 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S68202 14-19-098079390 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20457167