:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Simulasi sistem produksi dan penerapan sistem produksi hybrid push/pull: studi kasus PT. Moreen JBBK = Simulation of production system and implementation of hybrid push/pull production system: case study of PT. Moreen JBBK

Harrtyan Muhammad; Ratih Dyah Kusumastuti, supervisor; Harahap, Akhir Matua, examiner; Fajar Ayu Pinagara, examiner ([Publisher not identified] , 2017)

 Abstrak

ABSTRAK
Penelitian ini membahas mengenai dampak penerapan sistem hybrid push/pull pada perusahaan produsen komponen otomotif yang menggunakan sistem produksi push pada proses produksinya. Hasil dari penelitian banyak ahli menunjukan bahwa dengan penetapan sistem produksi hybrid perusahaan bisa mendapatkan keuntungan dari dua tipe produksi yaitu sistem produksi push dan juga pull, serta dapat mengurangi kelemahan dari masing-masing sistem. Tujuan dari penelitian ini adalah untuk memberikan manfaat terhadap perbaikan sistem produksi dan menjadi pertimbangan terhadap perusahaan dalam optimalisasi terhadap proses produksinya. Perusahaan yang dijadikan objek penelitian adalah PT. Moreen JBBK, produsen komponen otomotif yang berlokasi di Jababeka, Cikarang, Jawa Barat. Analisis sistem produksi dan juga penerapan sistem produksi hybrid push/pull pada penelitian ini akan dilakukan dengan metode simulasi discrete event dengan menggunakan software simulasi Arena.

ABSTRACT
This study discusses about the impact of applying hybrid push pull production system to automotive component manufacturer which uses push production system in its production process. Many experts have conducted research on the hybrid push pull production system. The results of the study indicate that with the establishment of hybrid production system the company can take the benefit from two types of production push and pull, and can reduce the weaknesses of each system. The push system has a weakness in its high inventory levels, while the pull system has a weakness in long lead time production. The purpose of this study is to provide benefits to the improvement of production systems and into consideration of the company in the optimization of the production process. The company that used as research object is PT. Moreen JBBK, a company that produces automotive components located in Jababeka, Cikarang, West Java. Analysis of production system and also implementation of hybrid push pull production system in this research will be conduct by discrete event simulation method using Arena simulation software.

 File Digital: 1

Shelf
 S69238-Harrtyan muhammad .pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S69238
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2017
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiii, 70 pages : illustration ; 29 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S69238 14-19-590156984 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20457606