Analisa lini produk menggunakan teknik value stream mapping pada perusahaan otomotif PT Mercedes-Benz Indonesia = Product line analysis through value stream mapping on automotive industry at PT Mercedes-Benz Indonesia
Hari Susanto;
Rizky Luxianto, supervisor; Helman Arif, examiner; Athor Subroto, examiner
(Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2017)
|
Skripsi ini membahas mengenai penerapan value stream mapping pada salah satu perusahaan otomotif yaitu PT Mercedes-Benz Indonesia. Fokus bahasan dari penelitian ini adalah proses perbaikan production flow, pengurangan cycle time dan takt time, bagaimana perbaikan proses produksi melalui value stream mapping, serta pengidentifikasian pemborosan. Tujuan dari penelitian adalah untuk menganalisa apakah value stream mapping dapat meningkatkan lini produk pada PT Mercedes-Benz Indonesia. Penelitian ini menggunakan metode triangulasi yang menggabungkan metode kuantitatif dan metode kualitatif. Hasil utama dari penelitian yaitu : 1 penerapan value stream mapping dapat memperbaiki production flow dan proses produksi dengan melihat antara current state map dan future state map ; 2 berdasarkan hasil future state map menunjukkan bahwa dengan mengimplementasikan value stream mapping, nilai lead time produksi berkurang dari 977 menit menjadi 846 menit dengan presentase sebesar 13.40. Nilai takt time berkurang dari 42 menit menjadi 38 menit dengan presentase 9.52 ; 3 Identifikasi pemborosan yang terjadi yaitu waiting, unnecessary movement dan defects. This paper discussed about implementation of value stream mapping in automotive company at PT Mercedes Benz Indonesia. Focus of this research are to know the improvement process of production flow, cycle time and takt time reduction, improvement of production process through value stream mapping, also identification of waste. The goal of this paper is to analyse that value stream mapping can improve production line at PT Mercedes Benz Indonesia. This research used triangulation as methodology that combines both qualitative and quantitative approaches. The main findings from this research are 1 the implementation of value stream mapping can improve the production flow and production process that showed between current state map and future state map 2 Based from future state map, final results showed that by implementing value stream mapping, production lead time decreased from 977 minutes to 846 minutes with 13.40 percentage point decreased. Takt time decreased from 42 minutes to 38 minutes with 9.52 percentage point decreased, 3 Identification of waste type are waiting, unnecessary movement, and defects. |
S68570-Hari susanto .pdf :: Unduh
|
No. Panggil : | S68570 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2017 |
Program Studi : |
Bahasa : | Ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xiii, 74 pages : illustration ; 29 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
S68570 | 14-19-094442189 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20457735 |