Penilaian risiko keselamatan kerja pada pekerjaan pemasangan panel precast proyek pembangunan apartemen A oleh PT. X tahun 2017 = Occupational safety risk assessment of panel concrete installing job in project apartement a by PT. X in 2017

Mahmuda Soraya; Chandra Satrya, supervisor; Ridwan Zahdi Sjaaf, examiner; Yuni Kusminanti, examiner (Fakultas Kesehatan Masyarakat Universitas Indonesia, 2017)

 Abstrak

Penelitian ini membahas mengenai identifikasi dan analisis risiko keselamatan kerja pada pekerjaan pemasangan panel precast konstruksi di proyek pembangunan Apartemen A oleh PT. X tahun 2017. Penilaian risiko ini dititikberatkan kepada risiko yang akan dialami pekerja pada pekerjaan pemasangan panel precast yang terdiri atas 4 tahapan, yaitu: tahap pembongkaran panel precast, tahap lifting/erecting precast, tahap install/setting precast, tahap finishing pemasangan precast. Penilaian risiko dilakukan dengan menganalisis nilai kemungkinan probability , pajanan exposure , dan konsekuensi consequences dari setiap pekerjaan yang kemudian dibandingkan sengan standar tingkat risiko semi kuantitatif W.T. Fine J. Untuk mengetahui tingkat risiko yang ada pada setiap proses pekerjaan. Penelitian ini adalah penelitian deskriptif analitik dengan menggunakan metode semi kuantitatif AS/NZS 4360: 2004 tentang Manajemen Risiko. Disain penelitian yang dilakukan ialah penelitian observasional dengan pendekatan cross sectional. Pengumpulan data dilakukan dengan cara obervasi, wawancara tak terstruktur, dan melihat data milik perusahaan. Dari hasil penelitian ditemukan 62 risiko yang kemudian dikategorikan ke dalam level risiko. Dari 62 risiko yang ditemukan, 4 risiko masuk ke dalam kategori sangat tinggi, 23 risiko masuk ke dalam kategori prioritas 1, 9 risiko masuk ke dalam kategori substansial, 8 risiko masuk ke dalam kategori prioritas 3, dan 18 risiko masuk ke dalam kategori dapat diterima.

This study discusses about the safety risk identification and analysis in precast concrete installing process in project Apartemen A by PT. X in 2017. Risk assessment is focused to the risk that will be experienced by workers especially the panel concrete installing which consisted 4 stages and these are loading stage, lifting stage, installing stage, and finishing stage. the risk assessment in done by analizing the value of probability, exposure, and consequences of each phase of the work, then the values is compared to the standard of semi quantitative risk level W.T Fine J to determine the level of risk involved in each stage of the precast concrete installing job process. This study is using semi quantitative method AS NZS 4360 2004 which is about Risk Assessment. The design of this study is a descriptive analytic with cross sectional approach. The collection of data obtained from observation, unstructured interviews, and secondary data that company had. The result showed that there are 62 risks in the process. From the 62 risks founded, 4 risk are in very high level, 22 risks are in priority 1 level, 9 risks are in substantial level, 8 risks are in priority 3 level , and 18 risks are in acceptable level.

 File Digital: 2

Shelf
 S69826-Mahmuda Soraya .pdf :: Unduh
 S69826-Mahmuda Soraya .pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S69826
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2017
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xviii, 171 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S69826 14-19-792502990 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20458118