Pengukuran tingkat kematangan manajemen proyek: studi kasus PT. Kairos Utama Indonesia = Measuring project management maturity level case study PT. Kairos Utama Indonesia

Vicky Permana; Yudho Giri Sucahyo, supervisor; Sensuse, Dana Indra, examiner; Riri Satria, examiner (Fakultas Ilmu Komputer Universitas Indonesia, 2016)

 Abstrak

Keterlambatan dalam pengerjaan suatu proyek masih sering dialami oleh perusahaan berbasis proyek sehingga menyebabkan kerugian seperti keterbatasan dalam alokasi sumberdaya, biaya operasional yang meningkat dan keterlambatan waktu pembayaran. PT Kairos Utama Indonesia merupakan perusahaan berbasis proyek yang bergerak di bidang Teknologi Informasi, spesifik dalam pembuatan perangkat lunak, perancangan dan pemeliharaan infrastruktur. Perusahaan ini juga mengalami keterlambatan dalam pengerjaan proyek sebesar 66 dari total proyek yang ada pada tahun 2015.
Tingkat kesiapan dalam perencanaan dan pengerjaan sebuah proyek menjadi salah satu faktor yang menyebabkan adanya proyek yang mengalami keterlambatan. Dengan tingginya tingkat kematangan dalam manajemen proyek maka perusahaan akan memiliki persiapan yang lebih matang dalam pengerjaan proyek. Maka dari itu diperlukan pengukuran tingkat kematangan manajemen proyek saat ini agar nantinya perusahaan ini dapat menentukan langkah-langkah yang dapat dilakukan agar mencapai target tingkat kematangan tertentu dalam manajemen proyek. Model pengukuran tingkat kematangan yang digunakan adalah PMMM. Metode yang digunakan adalah menggunakan kuesioner dari pertanyaan yang sudah ada dan wawancara terhadap responden.
Dari pengukuran yang dilakukan, terdapat dua dari enam manajer proyek yang lulus pada pengukuran tingkat pertama dan tiga dari lima kategori pada pengukuran tingkat kedua. Berdasarkan hasil pengukuran tingkat kematangan pertama dan kedua, beberapa rekomendasi diberikan di setiap tingkatan agar perusahaan ini dapat memenuhi nilai minimum pada masing-masing tingkatan seperti memberikan pelatihan dan sertifikasi dalam manajemen proyek, mengintegrasikan jadwal dan biaya di dalam sebuah sistem, membangun kurikulum pelatihan tersendiri dan mendorong karyawan untuk memaksimalkan penggunaan tools dalam pengerjaan proyek.

Delay in project implementation is still experienced in project based organization. It can impacted on cost such as limited resource allocation, increasing operational cost, and delay in payment from customer to the company. PT Kairos Utama Indonesia is one of project based organization in Jakarta, which specified in software development, design and maintenance infrastructure. This organization also experienced delay in project implementation for almost 66 from their project in 2015.
Readiness level in planning and executing project is one of the factor that cause delay in project implementation. If a company have higher level in project management maturity, there will be higher readiness level when planning and executing the project. Therefore this company will need measurement for maturity level in project management to enable the company decide which step they need to do to gain higher level in project management maturity. PMMM will be used as measurement model for this research. Questionnaire and interview will held for specified respondents.
Based on measurement, two out of six project manager passed the first level and three out of five category also passed in second level. Based on the result, some recommendation on each level submitted to this company to ensure this company comply with PMMM minimum passing score. The recommendations are arrange training and certification to each PM with own curriculum, integrate cost and schedule control in new system, and encourage all project member to use proper tools or system on each project.

 File Digital: 1

Shelf
 SP-Vicky Permana.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : TA-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Ilmu Komputer Universitas Indonesia, 2016
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resources
Deskripsi Fisik : xiii, 79 pages : illustration : 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
TA-Pdf 16-18-746973617 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20459393