Studi kelayakan proyek: finansial model PLTS Gorontalo = Project feasibility study financial model for solar cell power plant Gorontalo
Dinda Ayuthia Rinanda;
Rudyan Kopot, promotor; Sunardji, examiner; Widya Perwitasari, examiner
([Publisher not identified]
, 2017)
|
ABSTRAK Laporan magang ini membahas mengenai Studi kelayakan proyek PLTS Gorontalo. Secara lebih rinci, laporan ini membahas kelayakan investasi proyek dengan melihat indikator ndash; indikator keuangan. Berdasarkan proses perhitungan, dapat dijelaskan bahwa proyek PLTS Gorontalo dikatakan layak secara finansial dengan melihat internal rate of return, net present value, dan payback periode. ABSTRACT This internship report discusses project feasibility study of solar cell power plant. In More details, this report discusses the feasibility of looking at financial indicators. Based on the calculation process, it can be concluded that Gorontalo PLTS project can be financially assessed by looking at internal rate of return, net present value, and payback time. |
TA-Dinda Ayuthia Rinanda.pdf :: Unduh
|
No. Panggil : | TA-Pdf; |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | [Place of publication not identified]: [Publisher not identified], 2017 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | computer |
Tipe Carrier : | online resource |
Deskripsi Fisik : | xiv, 69 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
TA-Pdf; | 16-18-212485160 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20459476 |