Pengembangan Teknik Audit Berbantuan Komputer pada Sistem Informasi Keuangan di Instansi XYZ = Development of Computer-Assisted Audit Techniques of Financial Information System at the Ministry of XYZ
Lovita Soraya Desideria;
Eliza Fatima, supervisor; Fitriany, examiner
([Publisher not identified]
, 2018)
|
ABSTRAK Laporan Magang ini membahas mengenai tahapan pengembangan Teknik Audit Berbantuan Komputer TABK pada Sistem Informasi Keuangan SIK di salah satu instansi pemerintah. Laporan ini juga membahas analisis kesesuaian antara tahapan pengembangan TABK yang dilakukan Firma ABC dengan kerangka pengembangan sistem oleh Romney dan Steinbart 2015 . Disimpulkan bahwa ada empat tahapan utama yang dilakukan untuk mengembangkan TABK yaitu Tahap Identifikasi, Tahap Diagnosis, Tahap Desain, dan Tahap Penyampaian. Pada Tahap Identifikasi, Tim Firma ABC memahami proses bisnis utama pada tiap modul yang ada pada SIK. Kemudian, dari setiap proses bisnis tersebut akan disusun risiko, tujuan, dan teknik pengujian TABK pada Tahap Diagnosis. Pada Tahap Desain, kebutuhan data dan script dari masing-masing risiko akan dibuat dan diuji. Tahap terakhir adalah Tahap Penyampaian dimana Tim Firma ABC melakukan presentasi hasil simulasi dan transfer knowledge serta menyampaikan script dan dokumen terkait. Secara umum, disimpulkan bahwa tahapan pengembangan TABK yang dilakukan sudah sesuai dengan kerangka pengembangan sistem oleh Romney dan Steinbart 2015 . ABSTRACT This report discusses the stages phases of the development of Computer Assisted Audit Techniques CAATs of Financial Information System FIS at a government institution. This report also discusses the conformity between the CAATs development as performed by Firma ABC and the system development framework described in Romney and Steinbart 2015 . This report concludes that there are four stages that are used to develop the CAATs, which are Identification Stage, Diagnosis Stage, Design Stage, and Delivery Stage. At Identification Stage, the development team studies system documents in order to understand the business process of each module in the FIS. Then, the team identifies the risks of each business process and develops the audit objective and procedures at Diagnosis Stage. At Design Stage, data requirements and script are developed and tested. The last stage is Delivery Stage in which the team presents the result of the simulation and transfers knowledge to the user. The team also delivers the script and related documents. Overall, the development stages of CAATs are consistent with the aforementioned framework on system development. |
TA-Lovita Soraya Desideria.pdf :: Unduh
|
No. Panggil : | TA-Pdf |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | [Place of publication not identified]: [Publisher not identified], 2018 |
Program Studi : |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
TA-Pdf | 16-18-171142181 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20468342 |