Analisis penerapan sistem manajemen keselamatan dan kesehatan kerja (SMK3) di PT Waskita Karya (persero) tbk pada proyek jalan tol Bekasi-Cawang-Kampung Melayu (Becakayu) = Analysis on the implementation of occupational health and safety management system at PT Waskita Karya (persero) tbk in Becakayu (Bekasi- Cawang-Kampung Melayu) toll road project
Antonia Putri Sri Probiyantono;
Kusnar Budi, supervisor; Rainingsih Hardjo, examiner
(Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2018)
|
Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja SMK3 perlu diterapkan oleh setiap masing-masing perusahaan guna mencegah dan melindungi para pekerja dari potensi bahaya yang dapat menyebabkan kecelakaan kerja. Salah satu perusahaan konstruksi ternama di Indonesia yang menerapkan SMK3 adalah PT Waskita Karya Persero Tbk. Pada penelitian ini lebih memfokuskan untuk meneliti penerapan SMK3 di Proyek Jalan Tol Becakayu. Proyek ini dipilih karena proyek ini telah menimbulkan tujuh korban dibandingkan proyek konstruksi lainnya. Teori yang digunakan sebagai operasionalisasi konsep pada penelitian ini adalah dari teori Mathis dan Jackson. Dalam penelitian skripsi ini digunakan pendekatan post positivist sebagai pendekatan penelitian dengan jenis penelitian deskriptif. Teknik pengambilan data menggunakan data primer yaitu wawancara mendalam dengan beberapa narasumber dan data sekunder yaitu studi kepustakaan. Dari hasil penelitian dapat disimpulkan bahwa PT Waskita Karya Persero belum menerapkan SMK3 dengan baik, dimana terdapat beberapa subindikator yang belum terpenuhi, seperti kurangnya pengawasan dari safety patrol dan pelaksana lapangan untuk mengawasi pekerja secara optimal dan menyeluruh, pelatihan yang masih belum konsisten, masih kurangnya kedisiplinan dari pekerja dalam pemakaian APD dan pelanggaran lainnya. Dari kelalaian yang dilakukan oleh pekerja yang menjadi penyebab kecelakaan dapat terjadi. Every organization is required to assure the implementation of the Occupational Health and Safety Management System OHSMS . One of Indonesia 39 s leading construction companies that has been applying OHSMS is PT Waskita Karya Persero Tbk. This research focuses on the implementation of OHSMS in Becakayu Toll Road Project applied by PT Waskita Karya Persero Tbk. The research selected this project because the project has seven casualties, that are more compared to other construction projects. The theory used as the concept operationalization of Mathis and Jackson rsquo s theory. The research uses post positivist approach as an approach with descriptive research type. It undertook data collection using primary data, i.e. interview with several resources and secondary data from literature study. From the results of research, it can be concluded that PT Waskita Karya Persero has not implemented OHSMS well. There are still some unfulfilled subindicator, such as lack of supervision from safety patrol and field officers to supervise the workers optimally, training which still not consistent, lack of discipline from workers in the use of PPE and other violations. From negligence made by the worker who caused the accident may occur. |
S-Pdf-Antonia Putri Sri Probiyantono.pdf :: Unduh
|
No. Panggil : | S-Pdf |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2018 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | computer |
Tipe Carrier : | online resource |
Deskripsi Fisik : | xv, 114 pages : illustration ; appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
S-Pdf | 14-20-990298588 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20473594 |