:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Analisis risiko rantai pasok pada proses pembelian bahan baku kosmetik dengan pendekatan COSO enterprise risk management (ERM) 2004: studi kasus pada PT Mandom Indonesia, Tbk = Supply chain risk analysis in raw material purchasing process with COSO enterprise risk management (ERM) 2004 approach: case study of PT Mandom Indonesia Tbk

Novi Elmeizi; M. Yusuf Khurdri, supervisor; Machmudin Eka Prasetya, examiner; Dian Nastiti, examiner (Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2018)

 Abstrak

Tujuan dari penelitian ini adalah untuk mengidentifikasi dan memitigasi risiko ndash; risiko rantai pasok yang ada pada proses pembelian bahan baku kosmetik di PT Mandom Indonesia, Tbk. Penelitian menggunakan pendekatan COSO Enterprise Risk Management ERM 2004 dengan metode penelitian studi kasus. Data primer yang diperoleh melalalui wawancara dengan Senior Leader Departemen Purchasing, General Manager Bagian Produksi, Manager Bagian Sales Planning, dan General Manager Warehouse. Data sekunder yang diperoleh dari dokumentasi perusahaan, laporan keuangan, atau laporan tahunan perusahaan dan informasi perusahaan yang berasal dari internet.
Hasil dari penelitian ini menunjukan bahwa terdapat 27 risiko rantai pasok yang terbagi menjadi 6 jenis risiko yaitu: risiko sumber daya manusia, produktivitas, penjualan, pengadaan bahan baku, penerimaan bahan baku dan pengawasan gudang, risiko kualitas dan risiko sistem. Perhitungan penilaian setiap risiko didasarkan pada tingkat dampak dan kerentanan terkait dengan dampak dan peluang keterjadian. Berdasarkan tingkat risiko dan dampak yang berpengaruh terhadap perusahaan, maka mitigasi risiko diprioritaskan pada risiko kekurangan produk yang diminta oleh konsumen, ketidaksesuaian jumlah barang datang dengan jumlah pesanan dari supplier dan penerimaan bahan baku dan pengawasan gudang.

The purpose of this research is to identify and mitigate supply chain risks of raw materials purchasing process in PT Mandom Indonesia, Tbk. This research used COSO Enterprise Risk Management ERM 2004 approach with study case method. Primary data collected through interviews with Senior Leader of Department Purchasing, General Manager of Production Division, Sales Manager Planning, and General Manager of Warehouse. Secondary data obtained from company documentation, annual reports, and internet.
The result of this research show there are 27 risks of supply chain, which divided in 6 type, that are human resource risks, productivity, sales, raw materials procurement and warehouse supervision, quality risks and system risks. Risks assessment calculation based on level of impact and vulnerability which depends on impact and the likelihood. From the calculation, the risks which have on top priority mitigation are lack of customer demand, unmatched raw materials quantity, receiving and warehouse supervision.

 File Digital: 1

Shelf
 S-Pdf-Novi Elmeizi.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2018
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xii, 79 bpages : illustration ; appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S-Pdf 14-21-316138263 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20474601