Pengembangan standar WBS (Work Breakdown Structure) untuk perencanaan safety berbasis risiko pada proyek jembatan cable stayed = Developement of risk-based standardized WBS (Work Breakdown Structure) for safety planning of cable stayed bridge construction project

Gilang Satrio; Yusuf Latief, supervisor; Leni Sagita Riantini, supervisor; Ayomi Dita Rarasati, examiner; Eddy Subianto, examiner; Wisnu Isvara, examiner (Fakultas Teknik Universitas Indonesia, 2018)

 Abstrak

Dalam sebuah perencanaan proyek, Work Breakdown Structure WBS telah didefinisikan sebagai representasi total pekerjaan atau tahapan, termasuk dari awal sampai akhir proyek sehingga memiliki peran dalam kesuksesan sebuah proyek. Pada kenyataannya, proyek konstruksi jembatan di Indonesia banyak yang tidak sesuai dengan perencanaan dalam segi keselamatan kerja, oleh karena itu penting pengembangan WBS khususnya proyek konstruksi jembatan berbasis risiko. Hasil penelitian pengembangan WBS diharapkan menjadi acuan dalam proyek konstruksi jembatan khususnya jembatan cable stayed. Metode penelitian menggunakan metode survey kepada pakar jembatan untuk mengetahui standar WBS jembatan. Untuk mengetahui risiko dominan dilakukan dengan menggunakan analisis pareto berdasarkan Bill of Quantity dari 22 jembatan di Indonesia. Setelah melakukan analisis risiko, terdapat 9 risiko dominan yang mempengaruhi keselamatan kerja pekerjaan Jembatan Cable Stayed. Penelitian ini memberikan 5 rekomendasi standarisasi WBS jembatan cable stayed berbasis risiko.

In a project plan, the Work Breakdown Structure WBS has been defined as the total representation of work or stages, including from the beginning to the end of the project so as to have a role in the success of a project. In fact, many bridge construction projects in Indonesia are not in accordance with the planning in terms of safety, therefore it is important to develop WBS especially risk based bridge construction projects. The result of WBS development is expected to be a reference in bridge construction project especially cable stayed bridge. The research method used survey method to the bridge expert to know the standard of WBS bridge. To know the dominant risk is done by using pareto analysis based on Bill of Quantity from 22 bridges in Indonesia. After performing risk analysis, there are 9 dominant risks that affect the working safety of Bridge Cable Stayed. This study provides 5 recommendations for WBS standardization of risk based stay bridge.

 File Digital: 1

Shelf
 T50736-Gilang Satrio.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T50736
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2018
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xvii, 366 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T50736 15-18-607167830 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20475524