:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Pengembangan sistem manajemen mutu pada pekerjaan pemeliharaan dan proses perencanaan pekerjaan perawatan bangunan gedung pemerintah berbasis risiko = Development of quality management system in the maintenance and planning process repair risk-based in government building / Riany Aldesty

Riany Aldesty; Yusuf Latief, supervisor; Leni Sagita Riantini, examiner; Eddy Subiyanto, examiner; Wisnu Isvara, examiner ([Publisher not identified] , 2018)

 Abstrak

ABSTRAK
Bangunan gedung pemerintah membutuhkan pemeliharaan dan perawatan guna memperpanjang usia bangunan sehingga pelayanan kepada masyarakat secara tidak langsung dapat terpenuhi. Anggaran dikeluarkan tiap tahun oleh pemerintah untuk memelihara dan merawat bangunan, akan tetapi dalam melaksanakan pemeliharaan dan perawatan belum ada Sistem Manajemen Mutu yang menjadi dasar pemeliharaan dan perawatan bangunan gedung pemerintah. Penelitian ini bertujuan untuk mengembangkan Sistem Manajemen Mutu yang berbasis risiko pada proses pemeliharaan dan perencanaan pekerjaan perawatan di Gedung Pemerintah. Metode penelitian yang digunakan dalam penelitian ini yaitu Delphi method dan survei responden. Dengan variable risiko yang paling dominan dipilih menggunakan kusioner dan dianalisa menggunakan SPSS agar mendapatkan hasil yang akurat. Hasil penelitian ini berupa Standar Operasional Prosedur dan Instruksi Kerja berbasis risiko yang dapat meningkatkan kualitas dan kinerja laik fungsi gedung dalam manajemen pemeliharaan dan perawatan gedung. Terdapat struktur organisaasi dan jobdesk lembaga X dengan 9 proses bisnis, 89 aktivitas berserta input dan output terkait, 11 risiko tertinggi dengan 29 tindakan pengembangan.

ABSTRACT
Government buildings require maintenance and repair to extend the life of the building so that services to the community can be indirectly met. The budget is issued annually by the government to maintain and repair the building, but in carrying out maintenance and repair there is no Quality Management System which is the basis of maintenance and repair of government buildings. This study aims to develop a Quality Management System Risk Based in the maintenance and planning repair process in Government Building. Method used in this research is Delphi method and respondent survey. The most dominant risk variables selected using questioner and analyzed SPSS. The results of the research is Standard Operation Procedures and Work Instructions risk based can improve the quality and performance of building function in the management and repair of buildings with renewable methods. Be found the organization and jobdesk of institution X, which has 9 process busniss, 89 activities with input and output related, 11 highest risks with 29 action risk based QMS Development

 File Digital: 1

Shelf
 T50723-Riany Aldesty.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T50723
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2018
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xvi, 378 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T50723 15-19-807442100 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20475583