:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Analisis perbandingan metode AHP, metode evidential reasoning, dan metode terapan on/off dalam pemilihan kontraktor engineering, procurement, and construction = Comparative analysis of AHP method, evidential reasoning method, and applied on/off method in choosing engineering, procurement, and construction contractors / Utami Rianti

Utami Rianti; Farizal, supervisor; Djoko Sihono Gabriel, supervisor; Rahmat Nurcahyo, examiner; M. Dachyar, examiner ([Publisher not identified] , 2018)

 Abstrak

ABSTRAK
Kondisi cadangan migas di Indonesia saat ini mengharuskan pembangunan atau perbaikan kilang minyak untuk memenuhi kebutuhan migas. Proses pembangunan kilang termasuk kedalam proyek EPC karena termasuk proyek skala besar yang nilai proyeknya bisa mencapai US 1.122.700,00. Menyadari betapa vitalnya proyek ini, penujukkan kontraktor EPC harus memperhatikan banyak kriteria. Pada penelitian ini metode pengambilan keputusan multi kriteria yaitu metode AHP dan metode ER dibandingkan dengan proses pemilihan kontraktor EPC di sebuah perusahaan migas skala nasional yang menggunakan metode ON/OFF untuk melihat apakah terjadi perbedaan perusahaan kontraktor yang menjadi pemenang atau tidak.Tujuan utama penelitian ini adalah memberikan saran kepada perusahaan tersebut metode yang paling tepat untuk diterapkan dalam pemilihan kontraktor EPC. Hasil dari penelitian ini menunjukkan bahwa pada setiap metode memiliki hasil pemenang alternatif yang sama yaitu Konsorsium A. Dari hasil penelitian ini metode yang paling tepat adalah tetap menggunakan metode ON/OFF yang sudah diterapkan, dengan sedikit penyesuaian pada tahap akhir yaitu tidak hanya melihat harga penawaran terendah tetapi juga mempertimbangkan nilai masing-masing perusahaan dari tahap kualifikasi teknis

ABSTRACT
The current condition of oil and gas reserves in Indonesia requires the development or refinement of oil refineries to meet the needs of oil and gas. The refinery development process is included in the EPC project as it includes large scale projects whose project value can reach US 1,122,700.00. Recognizing the vital importance of this project, the EPC contractor has to pay attention to many criteria. In this research, multi criteria decision making method is AHP method and ER method compared with the process of selecting EPC contractor in a national scale oil and gas company using ON OFF method to see whether there is a difference of contractor company that won or not. The main purpose of this research is giving suggestions to the company is the most appropriate method to be applied in the selection of EPC contractors. The results of this study indicate that in each method have the same alternative winning result that is Consortium A. From the results of this research the most appropriate method is to keep using the ON OFF method which has been applied, with a slight adjustment in the final stages of not only looking at the lowest bid price but also considering the value of each company from the technical qualification stage.

 File Digital: 1

Shelf
 T51605-Utami Rianti.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T51605
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2018
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiii, 75 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T51605 15-19-700825541 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20475646