Pengembangan kompetensi tim proyek berbasis risiko dalam rangka meminimalisir rework agar meningkatkan kinerja biaya pada proyek konstruksi bangunan gedung di PT. X = Development of project team competencies risk based in order to minimize rework and improve cost performance in building construction project PT. X
Mutia Zahrina Putri;
Leni Sagita Riantini, supervisor; Eddy Subiyanto, supervisor; Yusuf Latief, examiner; Hari Gumuruh Soeparto, examiner; Afrizal Nursin, examiner
(Fakultas Teknik Universitas Indonesia, 2018)
|
Pada beberapa proyek di PT.X terdapat keluhan pembengkakan biaya akibat banyaknya pekerjaan rework. Hal ini diindikasikan karena kurangnya pengelolaan SDM. Tim proyek seharusnya direkrut dan dikelola agar memiliki kemampuan tertentu agar menghasilkan kinerja biaya yang baik salah satunya dengan meminimalisir rework. Namun acuan yang digunakan untuk mengembangkan kompetensi tersebut belum mempertimbangkan faktor- faktor risiko penyebab rework. Sebagai respon permasalahan, penelitian ini bertujuan untuk mengidentifikasi risiko yang dapat mempengaruhi tugas dan tanggung jawab tim proyek dalam pengendalian mutu agar tidak terjadi rework sehingga meningkatkan kinerja biaya, serta mengembangkan kompetensinya berdasarkan jobdesc baru dengan adanya aktifitas yang dibutuhkan untuk merespon risiko tersebut. Metode penelitian yang digunakan adalah metode studi kasus dan metode survey. Sementara untuk mengetahui faktor risiko dominan menggunakan analisa risiko kualitatif. Penelitian ini menghasilkan sebuah tabel yang berisi elemen-elemen kompetensi beserta unjuk kerja terhadap 6 fungsi dalam organisasi proyek PT.X yang berperan dalam aktivitas respon risiko dominan yang telah diidentifikasi, serta modul pelatihan yang sesuai untuk mengisi gap kompetensi yang ada. In some projects in PT.X cost overrun being big problem due to large number of rework. This is indicated due to lack of human resources management. Project teams should be recruited and managed to have a certain understanding and ability to be able to produce good performance by minimizing rework. As reponse, this study aims to identify risks that may affect the tasks and responsibilities of the project team in quality control in order to avoid rework so cost performance can be improve and then to develop its competence based on new jobdesc by the activities required to respond those risks. The research method used is case study and survey. A case study conducted on PT.X as a building contractor. While the survey was conducted to determine the dominant risk factors using qualitative risk analysis. This study produces the elements of competence along with the performance of the 6 functions within the PT.X project organization that play a role in identified dominant risk response activities, as well as appropriate training modules to fill in the existing competency gap. |
T51427-Mutia Zahrina Putri.pdf :: Unduh
|
No. Panggil : | T51427 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Teknik Universitas Indonesia, 2018 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xvii, 188 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T51427 | 15-19-204984246 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20476002 |