Strategi manajemen penghapusan aset gedung di lingkungan Pemerintah Provinsi DKI Jakarta = The management strategy for government building disposal Process in Jakarta / Mulyadi

Mulyadi; Ayomi Dita Rarasati, supervisor; Leni Sagita Riantini, examiner; Afrizal Nursin, examiner; Eddy Subiyanto, examiner ([Publisher not identified] , 2018)

 Abstrak

ABSTRAK
Kelayakan gedung pemerintahan, khususnya perkantoran dan sekolah untuk pelayanan masyarakat dan infrastruktur sosial, harus terjaga dengan baik. Ketika gedung tersebut perlu direhabilitasi total, pemerintah terkadang harus menggabungkan proses pembongkaran dan dekonstruksi bangunan. Dalam siklus pengelolaan aset pemerintah, prosesnya mulai dari menghapus aset dari sistem akuntansi, memilih kontraktor pembongkaran bangunan, kemudian menghasilkan aset baru, dengan memilih kontraktor lainnya. Dalam beberapa tahun terakhir, durasi proses aktual ini didapat lebih lama dari waktu yang direncanakan. Oleh karena itu, penelitian ini bertujuan untuk mengembangkan strategi manajemen dalam rangka memperbaiki proses penghapusan gedung pemerintah.
Proses penelitian dimulai dari memperoleh faktor dominan yang mempengaruhi kelancaran proses penghapusan aset gedung dan didapatkan faktor-faktor tersebut yaitu kelayakan gedung, kelengkapan data aset, akurasi hasil penilaian, jadwal pelaksanaan
pembongkaran, pemaketan kegiatan lelang, evaluasi durasi pelaksanaan, evaluasi lingkup pekerjaan dan penerapan denda keterlambatan. Berdasarkan faktor dominan tersebut diusulkan dua strategi alternatif yaitu berdasarkan manajemen aset strategis dan
integrasi dengan proses pengadaan jasa konstruksi.

ABSTRACT
The feasibility of government building, especially offices and schools as public service and social infrastructures, must be well maintained. When the building needs to be majorly rehabilitated, the government sometimes has to combine building demolition and deconstruction process. In the government asset management cycle, the process
starts from erasing the asset from the accountancy system, by selecting a building demolition contractor, then produce a new asset, by selecting other builder contractor. In the past few years, the duration of this actual process acquired longer than the planned time. Therefore, this research aims to develop the management strategy in order to improve the government building disposal process.
The process of the research is started from obtaining the dominant factors that influence the smoothness of the building asset disposal process and the factors is the feasibility of the building, the completeness of the asset data, the accuracy of the assessment results, the demolition schedule, packaging of the auction, evaluation of demolition duration, evaluation of scope of work and the application of the fine delays. Based on these dominant factors, two alternative strategies are proposed based on strategic asset
management and integration with the procurement process of construction Services.

 File Digital: 1

Shelf
 T50806-Mulyadi.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T50806
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2018
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xviii, 194 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T50806 15-20-035768447 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20476100