Full Description
Cataloguing Source | LibUI ind rda |
Content Type | text (rdacontent) |
Media Type | unmediated (rdamedia); computer (rdamedia) |
Carrier Type | volume (rdacarrier); online resource (rdacarrier) |
Physical Description | xvii, 292 pages : illustration ; 28 cm + appendix |
Concise Text | |
Holding Institution | Universitas Indonesia |
Location | Perpustakaan UI, Lantai 3 |
- Availability
- Digital Files: 1
- Review
- Cover
- Abstract
Call Number | Barcode Number | Availability |
---|---|---|
T50742 | 15-18-957020572 | TERSEDIA |
No review available for this collection: 20476259 |
Abstract
Work Breakdown Structure WBS adalah perincian deliverable dan pekerjaan proyek menjadi komponen yang lebih kecil sehingga dapat dikelola lebih baik. Kualitas proyek juga penting untuk dikontrol dan pendekatan risiko kini disyaratkan untuk keseluruhan proses manajemen mutu. Oleh karena itu, pengembangan WBS berbasis risiko diusulkan untuk perencanaan kualitas pekerjaan flyover.
Penelitian yang dilakukan terdiri dari beberapa tahap dengan metode analisis risiko kualitatif. Hasilnya menunjukkan bahwa standar WBS terdiri dari 6 level dengan 5 variabel risiko dominan pada kualitas kinerja dan direkomendasikan respon risiko sebagai pengembangan standar WBS.
Work Breakdown Structure WBS is a breakdown of project works into smaller components so it can be better managed. It is also known that the quality of project works is also important to controlled in order to avoid mismatch. The approaches of risk considerations are now required for the whole process on quality management. Therefore, the development of risk based standardized WBS is proposed for quality planning of flyover works. The conducted research consists of several stages with qualitative risk analysis method. The result indicate that standardized WBS consists of 6 level with 5 dominant risk variables on quality performance and recommended risk responses as the development of standardized WBS.
Work Breakdown Structure WBS is a breakdown of project works into smaller components so it can be better managed. It is also known that the quality of project works is also important to controlled in order to avoid mismatch. The approaches of risk considerations are now required for the whole process on quality management. Therefore, the development of risk based standardized WBS is proposed for quality planning of flyover works. The conducted research consists of several stages with qualitative risk analysis method. The result indicate that standardized WBS consists of 6 level with 5 dominant risk variables on quality performance and recommended risk responses as the development of standardized WBS.