Simulasi model estimasi biaya kontingensi berbasis risiko pada proyek bangunan industri dengan kontrka rancang bangun = Simulation model of risk based contingency costs estimation in industrial building projects with design build contract
Filbert Reginald;
Yusuf Latief, supervisor; Eddy Subianto, examiner; Leni Sagita Riantini, examiner; Ayomi Dita Rarasati, examiner
(Fakultas Teknik Universitas Indonesia, 2018)
|
ABSTRAK Rancang bangun adalah salah satu metode penyelesaian proyek yang banyak menerimaperistiwa risiko akibat terintegrasinya berbagai aktivitas mulai dari aktivitas designsampai dengan aktivitas build. Dalam 5 tahun, terdapat 63 dari 72 proyek industridengan kontrak rancang bangun mengalami penyimpangan biaya. Salah satu strategimanajemen risiko adalah memasukan biaya kontingensi dalam estimasi biaya. Penelitianini bertujuan untuk membuat suatu model perhitungan biaya kontingensi berbasis risikodari setiap aktivitas yang terjadi pada 7 proses bisnis kontraktor rancang bangun mulaidari proses bisnis design, procurement, finance, controlling, build, safety dan contractcontrolling. Metode yang digunakan pada penelitian ini adalah simulasi monte carlo.Hasil penelitian ini adalah suatu model persentase biaya kontingensi sebesar 4,46 4,91 dengan tingkat kepercayaan 95 . Dimana didapatkan 7 proses bisnis, 145aktivitas, 31 output dan 10 peristiwa risiko tertinggi yang berpengaruh signifikantterhadap kinerja biaya proyek. ABSTRACT Design build is one method of project completion that accepts many risks due to theintegration of various activities start from design activities until build activities. Within 5years, 63 from 72 industrial projects with design build contract is experiencing costoverrun. One of the risk management strategies due to uncertainty is to include acontingency cost amount in the estimated cost. This study aims to make model calculationof risk based contingency costs from each activity in 7 business process contractor designbuild, start from design, procurement, finance, controlling, build, safety and contractcontrolling. The method used in this research is monte carlo simulation. The result of thisresearch is a contingency cost percentage model of 4.46 4.91 with 95 confidencelevel. Which has 7 business processes, 145 activities, 31 outputs and 10 highest riskevents that have a significant effect on project cost performance. |
T50195-Filbert Reginald .pdf :: Unduh
|
No. Panggil : | T50195 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | Jakarta: Fakultas Teknik Universitas Indonesia, 2018 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xvi, 414 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T50195 | 15-18-989402981 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20477700 |