Kolaborasi para pihak untuk mengurangi construction waste pada proyek rancang bangun = Collaboration of parties to reduce construction waste on the design-build project

Afrizal Nursin; Yusuf Latief, promotor; Krishna Mochtar, co-promotor; Hari Gumuruh Soeparto, co-promotor; R. Jachrizal Sumabrata, examiner; Chaidir Anwar Makarim, examiner; Ayomi Dita Rarasati, examiner; Leni Sagita Riantini, examiner (Fakultas Teknik Universitas Indonesia, 2018)

 Abstrak

ABSTRAK
Kolaborasi para pihak pada proyek konstruksi rancang bangun di Indonesia merupakan masalah yang serius. Indikator keberhasilan kolaborasi para pihak, dapat diukur secara tepat berkaitan dengan kemampuannya mengurangi Construction Waste CW . Dari penelitian yang dilakukan pada tiga tahun terakhir, pada beberapa proyek konstruksi terlihat kecenderungan CW meningkat secara signifikan. Tujuan penelitian ini adalah untuk menemukenali model kolaborasi para pihak pada proyek konstruksi rancang bangun yang dapat mengurangi CW. Metode yang digunakan dalam penelitian ini adalah metode Survey, dimana data yang diperoleh diolah dengan menggunakan SEM-PLS 3.0, sehingga hasil penelitian ini dapat menemukan solusi dari permasalahan CW dan menguranginya dengan meningkatkan kolaborasi antar pihak. Melalui model kolaborasi antar pihak yang diterapkan dengan mengelola para pihak, memahami budaya, meminimalisasi konflik dan meningkatkan komunikasi, sehingga dapat mengurangi CW fokus pada non-physical time overrun construction waste pada proyek konstruksi Rancang Bangun.

ABSTRACT
The collaboration of the parties to the construction design project in Indonesia is a serious problem. Indicators of the successful collaboration of the parties can be accurately measured concerning its ability to reduce Construction Waste CW . From research conducted in the last three years, on some construction projects seen a tendency CW increased significantly. The purpose of this study is to identify the collaborative model of the parties to a construction design project that can reduce CW. The method used in this research is Survey method, where the data obtained is processed by using SEM-PLS 3.0, so that the results of this research can find a solution of CW problem and reduce it by increasing collaboration between parties. Through a collaborative model between parties implemented by managing the parties, understanding the culture, minimizing conflict and improving communication, to reduce the CW of non-physical time overrun construction waste on the construction project Design and Build

 File Digital: 1

Shelf
 D2528-Afrizal Nursin.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : D2528
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2018
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xviii, 297 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
D2528 07-21-111677862 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20477786