Pengembangan standar wbs (work breakdown structure) untuk meningkatkan perencanaan penjadwalan pada proyek konstruksi pelabuhan udara berbasis risiko = Development of risk-based standardized wbs (work breakdown structure) to improve scheduling planning of airport construction works

Sitohang, Daniel Tampak Raja Tua; Yusuf Latief, supervisor; Leni Sagita Riantini, supervisor; Wisnu Isvara, examiner; Eddy Subiyanto, examiner; Afrizal Nursin, examiner (Fakultas Teknik Universitas Indonesia, 2018)

 Abstrak

Proyek pengembangan pelabuhan udara termasuk dalam daftar Proyek Strategis Nasional Indonesia yang ditetapkan dalam Peraturan Presiden no.58 / 2017. Pemerintah berkomitmen untuk mewujudkan kemandirian ekonomi dengan meningkatkan pembangunan infrastruktur dan salah satunya dengan menggerakkan sektor ekonomi yang harus didukung oleh salah satunya adalah pembangunan pelabuhan udara di daerahdaerah yang dapat memacu dampak ekonomi. Namun dalam prakteknya, sering ada keterlambatan dalam proses pelaksanaan pembangunan pelabuhan udara yang berdampak negatif terhadap pemangku kepentingan yang terkait dengan proyek. Pada kajian dari beberapa literatur didapat bahwa pelaku konstruksi masih belum terlalu familiar membuat WBS yang benar.
WBS yang umum dilakukan pada praktik pengelolaan proyek WBS yang tidak formal yang hanya mengacu pada Bill of Quantity sehingga menimbulkan persepsi yang tidak akurat dan sama antar pihak dalam mengelola proyek. Jadi dibutuhkan manajemen proyek konstruksi pelabuhan udara yang baik dan tepat untuk menghilangkan fenomena ini agar tercipta keseragaman pemahaman mengenai harapan terhadap konstruksi bandar udara dan pengelolaan yang lebih baik dan detail. Work Breakdown Structure (WBS) adalah dekomposisi aktivitas proyek yang dipecah menjadi beberapa elemen kerja berdasarkan hirarki. WBS membuat manajemen proyek lebih spesifik sehingga risiko terhadap kelemahan kinerja waktu dapat diantisipasi dan dikelola di tingkat sumber daya.
Penelitian ini bertujuan untuk mengembangkan standar WBS berbasis risiko untuk meningkatkan kinerja waktu konstruksi proyek bandara. Hasil dari penelitian ini adalah standar WBS pelabuhn udara yang berisi hingga level paket pekerjaan,level metode pelaksanaan, level aktivitas, dan level sumber daya material, peralatan, dan tenaga kerja, serta respon monitoring terhadap potensi risiko tertinggi yang berpengaruh terhadap kinerja waktu proyeksebagai upaya dalam mencegah, mengurangi atau menghilangkan potensi peristiwa yang dapat memperlambat selesainya proyek pembangunan pelabuhan udara. Dihasilkan 6 level WBS hingga kepada sumber daya dengan metode sebagai penghubung antara paket pekerjaan dengan aktivitas. Penelitian ini juga menghasilkan 13 variabel risiko dominan yang mempengaruhi kinerja waktu proyek dan rekomendasi respon risiko yang menjadi dasar pengembangan WBS standar. 

The airport development project is included in the list of Indonesian National Strategic Projects stipulated in Presidential Regulation no.58 / 2017. The government is committed to realizing economic independence by increasing infrastructure development and one of them is by moving the economic sector which must be supported by one of them areas that can spur economic impacts. But in practice, there are often delays in the process of implementing airport development which has a negative impact on stakeholders related to the project. In a study from several literature, it was found that construction actors are still not too familiar to make the correct WBS.
A common WBS is carried out in the informal management practices of the WBS project which only refers to the Bill of Quantity, giving rise to inaccurate and similar perceptions between parties in managing the project. So it is necessary to have a good and appropriate airport construction project management to eliminate this phenomenon in order to create a uniform understanding of airport construction and better and more detailed management. Work Breakdown Structure (WBS) is a decomposition of project activities that is broken down into several work elements based on hierarchy. WBS makes project management more specific so that risks to weaknesses in time performance can be anticipated and managed at the resource level.
This study aims to develop risk-based WBS standards to improve the performance of airport project construction times. The results of this study are the WBS standards for air ports that contain up to the level of work packages, the level of implementation methods, the level of activity, and the level of material resources, equipment, and labor, and monitoring responses to the highest potential risks that affect project performance prevent, reduce or eliminate potential events that can slow the completion of an airport development project. Produced 6 levels of WBS to resources with methods as a link between work packages and activities. This study also produced 13 dominant risk variables that affect project time performance and risk response recommendations which are the basis for developing standard WBS.

 File Digital: 1

Shelf
 T52599-Daniel Tampak Raja Tua Sitohang.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T52599
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2018
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xix, 740 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T52599 15-19-832009157 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20481916