Pengembangan standar WBS (Work Breakdown Structure) berbasis risiko untuk estimasi biaya pada proyek bendungan = Development of standardized WBS (Work Breakdown Structure)
Propezite Nurhutama Mustain;
Yusuf Latief, supervisor; Leni Sagita Riantini, supervisor; Wisnu Isvara, examiner; Afrizal Nursin, examiner; Eddy Subiyanto, examiner
(Fakultas Teknik Universitas Indonesia, 2019)
|
Dalam proyek konstruksi bendungan khususnya pada proyek bendungan urugan tanah dikatakan sukses jika dilakukan pendefinisian lingkup proyek sesuai dengan persyaratan. WBS (Work Breakdown Structure) merupakan penguraian pekerjaan menjadi lebih kecil dan mudah dikendalikan. Standarisasi WBS sangat penting karena akan sangat berpengaruh terhadap estimasi biaya. Tujuan dari penelitian ini adalah mengembangkan WBS Bendungan. Metodologi yang digunakan berdasarkan peraturan Pedoman Pelaksanaan Konstruksi Bendungan Urugan Ditjen SDA (2004) dan BOQ (Bill of Quantity) proyek bendungan yang berada di Indonesia. Hasil dari penelitian ini adalah standar WBS terdiri dari 6 level dengan menganalisa variabel risiko dominan yang mungkin terjadi yang berpengaruh terhadap pengendalian biaya proyek dan pengembangan WBS standar dengan dilakukan rekomendasi respon risiko. Sebagai hasilnya, penelitian ini akan mengusulkan standar WBS yang berbasis risiko untuk proyek-proyek bendungan urugan tanah yang dapat meningkatkan estimasi biaya proyek. Dam construction project especially earthfill dam can be successful if the scope of works is defined in accordance with the requirement. Work Breakdown Structure (WBS) divides tasks into smaller items which makes them easier to be controlled. WBS standardization has critical impact on the cost of project. The purpose of this research is to develop WBS of dam construction project. The methodology used to develop the WBS of dam is based on the regulation and guidelines related to the implementation of dam construction such as The General Specification of Earthfill Dam, Ministry of Public Works and Public Housing Indonesia (2004) and bill of quantity from earthfill dam projects in Indonesia. The research is conducted by making a questionnaire survey for dam project contractors. The output of this study is WBS standard which comprises of 6 levels by analyzing dominant risk variables that may affect project cost control and WBS standard development with risk responses recommendation. As a result, this research will propose a risk-based WBS standard for earthfill dam projects that can improve the cost estimate of the project. |
![]()
|
No. Panggil : | T51950 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Teknik Universitas Indonesia, 2019 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xvi, 480 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T51950 | 15-20-224191199 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20481949 |