Analisis implementasi program pengembangan pemberdayaan masyarakat sekitar tambang di perusahaan batubara = Analysis of the implementation program for community development and empowerment around mine in coal companies

Marikha Ulfah Utami; Setyo Sarwanto Moersidik, supervisor; Lana Saria, supervisor; Udi Syahnoedi Hamzah, examiner; Soemarno Witoro Soelarno, examiner; Tri Edhi Budhi Soesilo, examiner (Sekolah Ilmu Lingkungan Universitas Indonesia, 2019)

 Abstrak

Kenaikan harga batubara dunia yang mencapai USD 100,69/ton, mempengaruhi pendapatan negara dan peningkatan produksi batubara di Indonesia. Di sisi lain, kegiatan penambangan batu bara menyebabkan sejumlah konflik sosial dan lingkungan. Penelitian ini bertujuan untuk mengkaji pelaksanaan program pengembangan dan pemberdayaan masyarakat (PPM) terkait peran Pemerintah Pusat, Pemerintah Daerah, Pengusaha dan masyarakat di sekitar tambang, biaya PPM, serta aspek yang paling berpengaruh untuk keberlanjutan. Metode yang digunakan adalah wawancara mendalam, analisis regresi dan korelasi, dan Analytical Hierarchy Process (AHP).
Hasil penelitian menunjukkan bahwa perusahaan melakukan pelaksanaan pengembangan masyarakat dengan melibatkan masyarakat dan pemerintah (pusat dan daerah). Hasil statistik regresi menunjukkan hubungan antara variabel bersifat positif dan kuat (R= 0,82 dan R2=67%), dengan rumus persamaan biaya pengembangan masyarakat = 979.296.927,41 + 858,95 (Produksi Batubara), untuk tingkat produksi batubara diatas 1.000.000 ton. Jumlah produksi batubara berpangaruh pada variabel biaya PPM yang artinya jika produksi batubara meningkat, maka pelaksanaan kegiatan dan biaya PPM bertambah. Alternatif implementasi kegiatan PPM yang tepat untuk kemandirian ekonomi dan pembangunan berkelanjutan adalah perkebunan dan peternakan terintegrasi dengan bobot 0,57.

Along with the significant increase of world coal price reaching USD 100.69/ton, it can be affects the increase of coal production in Indonesia and state revenues. On the other hand, coal mining activities cause a number of social and environmental conflicts. On the other hand, coal mining activities cause a number of social and environmental conflicts. This study examines the implementation of community development and empowerment (PPM) programs related to the role of the Central Government, Regional Governments, Entrepreneurs and communities around the mine, and the cost of PPM, as well as the most influential aspects for sustainability.
Results of interviews and primary data analysis, implementation of Community Development carried out by the Company involving the community and the government (central and regional). The regression statistical results show the relationship between variables (R2 = 67%), and also the Community Development Cost Equation formula = 979,296,927.41 + 858.95 (Coal Production). Coal Production and Production Costs have a positive effect on the Community Development Cost variable, which means that if coal production increases, the cost of PPM will increase. The alternative program for PPM activities that can be chosen for economic independence and sustainable development is integrated plantation and livestock activities with a weight of 0.57.

 File Digital: 1

Shelf
 T52318-Environmental Friendly.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T52318
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Sekolah Ilmu Lingkungan Universitas Indonesia, 2019
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xxii, 128 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T52318 15-22-70965242 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20482552