:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Pengelolaan risiko pengadaan proyek development of world class university at Universitas Indonesia dengan sumber dana Pinjaman Luar Negeri (PLN) = The risk management of procurement at development of world class university at University of Indonesia with foreign loans / Tria Purnama Sari

Tria Purnama Sari; Yusuf Latief, supervisor; Setyo Suprijadi, supervisor; Eddy Subiyanto, examiner; Krishna Mochtar, examiner; Rosmariani Arifuddin, examiner ([Publisher not identified] , 2019)

 Abstrak

 

Untuk menghadapi kendala keterbatasan sumber dana pemerintah Indonesia memanfaatkan pinjaman luar negeri guna untuk melakukan pembangunan nasional. Universitas Indonesia yang merupakan universitas berkelas dunia memanfaatkan pinjaman luar negeri adalah untuk peningkatan kesehatan nasional, yaitu dengan membangun Rumah Sakit Universitas yang berintegerasi dengan Fakultas Rumpun Ilmu Kesehatan atau dikenal dengan Proyek Development of World Class University at UI. Penelitian ini bertujuan untuk mengidentifikasi faktor – faktor yang mendukung percepatan durasi pada proyek pembangunan Rumah Sakit Pendidikan UI dan untuk mengetahui apakah dengan percepatan ini dapat mereduksi biaya proyek secara keseluruhan pada proyek pinjaman luar negeri. Teknik pengumpulan data menggunakan metode survey kuisioner, kemudian dilakukan pengambilan sampel secara acak (stratified random sampling). Analisa data menggunakan software SPSS dengan hipotesa awal adalah dengan melakukan percepatan pada proyek dapat mengurangi biaya proyek pinjaman luar negeri.

 


To a lack of adequate government funding sources, Indonesia government utilize foreign loans in order to carry out national development. University of Indonesia, which is a world-class university, utilizing foreign loans to increase national health, is building the integrated University Hospital and Faculty of Health Sciences known as Project Development of World Class University at UI. This study aims to identify factors that support the acceleration duration of the construction project UI Teaching Hospital and to determine whether this acceleration can reduce overall project costs on foreign borrowing project. Data collection techniques using questionnaire survey method, then do random sampling (stratified random sampling). Data were analyzed using SPSS software with the initial hypothesis is to accelerate the project can reduce the cost of foreign borrowing project.

 File Digital: 1

Shelf
 T53434-Tria Purnama Sari.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T53434
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2019
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiii, 133 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T53434 15-21-390755729 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20488439