:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Analisa Faktor Penyebab Klaim pada Proyek Konstruksi denganKontrak Design and BuildterhadapKinerja Biaya dan Waktu Proyek(Studi Kasus Proyek XXX) = Analysis of Factors Causing Claims in Construction ProjectswithDesign and BuildContract for The Project Cost andTimePerformance (Case Study of Project XXX

Yulida Resy Zarvani; Yusuf Latief, supervisor; Leni Sagita Riantini, examiner; Setyo Supriadi, examiner ([Publisher not identified] , 2016)

 File Digital: 1

Shelf
 S-Yulida Resy Zarvani.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2016
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated
Tipe Carrier : online resource
Deskripsi Fisik : xiv, 209 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S-Pdf 14-22-02698098 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20488455