:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Biaya Pengguna Jalan Akibat Kerusakan/Hambatan Jalan = Road User Costs Due To Road Repair Work

Demarda Kalimanto; Sigit Pranowo Hadiwardoyo, supervisor; R. Jachrizal Sumabrata, examiner; Andyka Kusuma, examiner; Nahry, examiner ([Publisher not identified] , 2019)

 Abstrak

Pergerakan lalu lintas kota Jakarta dihubungkan dengan jalan Tol Jakarta Outer Ring Road (JORR). Jaringan jalan ini memiliki volume lalu lintas tinggi karena terintegrasi dengan jalan tol lainnya yang menghubungkan antar kota dengan kota Jakarta. Kecenderungan jalan dengan volume lalu lintas padat apabila terjadi perbaikan jalan akan menimbulkan hambatan perjalanan mulai dari meningkatnya waktu perjalanan hingga tundaan panjang arus lalu lintas pada window time. Tundaan perjalanan tersebut menyebabkan kerugian bagi pengguna jalan. Penelitian ini mengkaji dampak perubahan kecepatan di zona kerja (work zone) dengan membagi dua area perkerjaan. Dari dua tipe ini dapat diketahui biaya yang dikeluarkan oleh pengguna jalan akibat tundaan perjalanan. Namun dari kerugian tersebut terdapat biaya perbaikan jalan yang menjadi tanggungan bagi pengelola jalan. Survey lalu lintas telah dilakukan di Jalan Tol Jakarta Outer Ring Road (JORR) seksi S menggunakan alat roadpod metrocount. Alat ini dapat menghitung penurunan kecepatan beserta volume lalu lintas pada dua lokasi zona kerja. Kerugian pengguna jalan akibat tundaan perjalanan dihitung dari biaya operasional kendaraan. Hasil dari penelitian ini didapat diketahui perubahan kecepatan rata-rata sebesar 53 km/h dan 59 km/h, kenaikan biaya operasional kendaraan sebesar 169 % dan 206 % akibat adanya penurunan kecepatan yang disebabkan oleh hambatan atau perbaikan jalan dan kenaikan total biaya pengguna jalan dengan biaya perbaikan jalan apabila mengalami tundaan penanganan.


The Jakarta city traffic movement is linked to the Jakarta Outer Ring Road (JORR) Toll Road. This road network has a high traffic volume because it is integrated with other toll roads that connect between cities and the city of Jakarta. The trend of roads with heavy traffic volume in the event of road repairs will cause travel obstacles starting from increasing travel time to the long delay in traffic flow at the window time. The travel delay caused losses to road users. This study examines the impact of changes in speed in the work zone by dividing the two work areas. From these two types, it can be seen the costs incurred by road users due to the delay in travel. However, from these losses there are costs for road repairs that are borne by road managers. Traffic surveys have been carried out on the Jakarta Outer Ring Road Toll Road (JORR) section S using the roadpod metrocount tool. This tool can calculate the decrease in speed along with the volume of traffic in the two locations of the work zone. Loss of road users due to travel delay is calculated from vehicle operating costs. The results of this study are known to change the average speed of 53 km/h and 59 km/h, an increase in vehicle operating costs by 169% and 206% due to a decrease in speed caused by road repairs and an increase in total road user costs with the cost of repairing the road if a delay occurs.

 File Digital: 1

Shelf
 T53170-Demarda Kalimanto.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T53170
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2019
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xxi, 81 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T53170 15-21-762267243 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20491096