Studi kelayakan injeksi CO2 untuk meningkatkan perolehan minyak pada Lapangan X menggunakan simulasi extended black oil = Feasibility study of CO2 injection to increase oil recovery in X Field using extended black oil simulation
Muhammad Salman;
Sukirno, supervisor; Dewi Tristantini Budi, examiner; Eny Kusrini, examiner; Cahyo Setyo Wibowo, examiner
(Fakultas Teknik Universitas Indonesia, 2019)
|
Fase produksi sekunder Lapangan X telah dilaksanakan dalam 10 tahun terakhir untuk mempertahankan tekanan reservoir dan meningkatkan pemulihan minyak, namun pemulihan minyak hanya sebesar 20,9%. Untuk meningkatkan perolehan minyak, dimanfaatkan CO2 gas buang sebesar 507 ton/day dari hasil stripping CO2 removal gas plant sebagai sumber injeksi ke reservoir Lapangan X. Simulator Extended Black Oil digunakan untuk mengevaluasi kinerja injeksi CO2 sehingga didapat laju alir injeksi CO2 optimum sebesar 1000 MCFD dengan produksi minyak kumulatif sebesar 4,2 MMSTB dan penambahan recovery factor sebesar 9,65%. Diperlukan fasilitas tambahan diameter 6 inch x panjang 25.000 kaki pipa gas bawah laut, dan satu kompresor reciprocating 3-tahap untuk menekan gas CO2 dari 2 psig menjadi 600 psig dengan nilai keekonomian dari proyek ini yaitu IRR sebesar 24,99% dan NPV 207,8 juta US$ dengan Pay Back Periode selama 4 tahun. The secondary production phase of Field X has been carried out in the last 10 years to maintain reservoir pressure and improve oil recovery, but oil recovery only 20,9%. To increase oil recovery, a 507 tons/day of CO2 gas venting from stripping CO2 removal gas plant is utilized as a source of injection into reservoir Field X. The performance analysis of CO2 injection was carried out using the Extended Black Oil simulator so that the optimum CO2 injection flow rate of 1000 MCFD was obtained with cumulative oil production of 4.2 MMSTB and an additional recovery factor of 9.65%. Required an additional facility of 6 inch diameter x 25,000 feet subsea gas pipe, and a 3-stage reciprocating gas compressor to suppress CO2 gas from 2 psig to 600 psig with the economic value of this project, namely an IRR of 24.99% and NPV 207.8 million US $ with a Pay Back Period for 4 years. |
T54714-Muhammad Salman.pdf :: Unduh
|
No. Panggil : | T54714 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Teknik Universitas Indonesia, 2019 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xii, 50 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T54714 | 15-22-46009857 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20492327 |