:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Analisis faktor-faktor yang mempengaruhi construction delays pada proyek infrastruktur olahraga. Studi kasus: PT. ABCD = Causative factor analysis of construction delays on sports infrastructure projects. Case study: PT. ABCD

Abidzar Basaib; Nofrisel, supervisor; Arviansyah, examiner; Harahap, Muslim E., examiner (Fakultas Eknonomi dan Bisnis Universitas Indonesia, 2019)

 Abstrak

Beberapa waktu terakhir, pembangunan infrastruktur menjadi perhatian dan prioritas utama pemerintah Indonesia. Anggaran infrastruktur tumbuh pesat, salah satu proyek besar adalah revitalisasi infrastruktur olahraga penunjang Asian Games 2018. Pembangunan ini melibatkan kontraktor besar, dibawah pengawasan Kementerian Pekerjaan Umum dan Perumahan Rakyat. PT. ABCD merupakan salah satu subkontraktor yang terlibat di berbagai proyek tersebut. Dikarenakan tingkat kompleksitas dan keterbatasan waktu serta sumber daya, mayoritas proyek yang dikelola kontraktor mengalami keterlambatan. Penelitian ini ingin mencari faktor utama penyebab keterlambatan proyek konstruksi olahraga, variabel apa yang mempengaruhi dan bagaimana cara mengatasinya. Penulis menggunakan PT. ABCD sebagai studi kasus, dan menyebar kuesioner pada 35 karyawan aktif yang terlibat pada manajemen proyek infrastruktu, dengan pengujian pada 32 variabel penyebab keterlambatan dari penelitian terdahulu. Setelah data terkumpul analisa dilakukan dengan kombinasi kuantitatif dan kualitatif serta melihat implikasi manajerial dengan acuan PMBOK Guideline. Penulis menemukan bahwa faktor yang menjadi penyebab adalah keterbatasan sumber daya yang dimiliki, serta variabel ketidakakuratan Bill of Quantity menjadi penyebab keterlambatan. Tujuan penelitian ini adalah untuk memberikan PT. ABCD dan pelaku usaha di industri yang serupa dapat memiliki rekomendasi untuk pencegahan terjadinya keterlambatan.

Infrastructure development is the governments main objective in recent years in Indonesia. The budget is growing significantly, and one of the biggest project is the infrastructure of Asian Games 2018. The development is involving a lot of contractors under the Ministry of Public Works, and PT. ABCD is one of the subcontractors that involved in certain numbers of projects. Because of the complexity and limitation of time and resources, most of the projects that managed by contractors are delayed, including the subcontractors projects. This paper wants to find out the main factor that causing delay in sports construction and what the variables are and how to deal with it. The author using PT. ABCD as a case study, and conduct a survey to 35 employees that involved in the project management at PT. ABCD, then testing 30 variables that causing delay from previous study. Then we analyzed the data collected, and combined the quantitative analysis with the qualitative analysis to see the managerial implication by analyzing literature and PMBOK. Author found out that the main factor that causing a delay is because of inaccurate Bill of Quantity, and followed by other factors, such as limited resources. The purpose of this paper is to give PT. ABCD and other company in common, a preventive action and recommendation.

 File Digital: 1

Shelf
 T54632-Abidzar Basaib.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T54632
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Eknonomi dan Bisnis Universitas Indonesia, 2019
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiv, 51 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T54632 15-21-396766654 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20494309