An optimal production scheduling under random selection within multi objective based on batch movement and asymmetrical setup time
Yun Cheng Huang, Yi An Ding, Xin Yi Chang (Taylor and Francis, 2018)
|
ABSTRACT This study considers the real situations of production between the products and the setup of production tools that are different. Therefore, this study considers the setup time of work stations and production batch in the production scheduling. This study proposed a random optimization algorithm with multi objective that can be selected to optimize the scheduling performance. VIP customers priorities, urgent orders, and asymmetrical setup times are considered. The objectives of this study include minimum makespan, minimum total delayed penalty, and minimum total number of delayed orders. After cases testing, we found that the proposed algorithm can improve the production performance efficiently. |
No. Panggil : | 658 JIPE 35:8 (2018) |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Penerbitan : | Philadelphia: Taylor and Francis, 2018 |
Sumber Pengatalogan : | LibUI eng rda |
ISSN : | 21681015 |
Majalah/Jurnal : | Journal of Industrial and Production Engineering |
Volume : | Vol. 35, No. 8, December 2018: Hal. 506-525 |
Tipe Konten : | text |
Tipe Media : | unmediated |
Tipe Carrier : | volume |
Akses Elektronik : | |
Institusi Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 4, R. Koleksi Jurnal |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
658 JIPE 35:8 (2018) | 03-19-991068725 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20495935 |