:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Pengembangan sistem informasi pekerjaan pemeliharaan dan perawatan komponen mekanikal berbasis peraturan menteri PU no 24 tahun 2008 pada bangunan gedung hijau pemerintahan = Development of information system maintenance of mechanical components based on ministerial regulation number 24/prt/m/2008 in state own green building / Aulia Rachman

Aulia Rachman; Yusuf Latief, supervisor; Rossy Armyn Machfudiyanto, supervisor; Wisnu Isvara, examiner; Van Basten, examiner ([Publisher not identified] , 2019)

 Abstrak

ABSTRAK
Keandalan fungsi komponen mekanikal memiliki implikasi yang besar terhadap tercapainya misi bangunan hijau yaitu reduksi emisi dan energi. Kegagalan dalam fase pemeliharaan dan perawatan komponen mekanikal dapat berakibat buruk terhadap pencapaian misi tersebut. Permasalahan yang terjadi adalah data terfragmentasi, data tidak terdokumentasi dengan baik, respon SDM yang lambat, dan tidak ada jadwal pemeliharaan. Akibatnya anggaran masif yang dikeluarkan di fase konstruksi bangunan hijau menjadi sia-sia. Tujuan dari penelitian ini untuk meningkatkan kinerja pemeliharaan dan perawatan bangunan hijau gedung pemerintahan komponen mekanikal. Studi kasus yang diteliti adalah Kementerian Pekerjaan Umum dan Perumahan Rakyat. Metode penelitian yang digunakan adalah tinjauan literatur, studi kasus dan pengembangan sistem. Penelitian ini menggunakan Work Breakdown Structure (WBS) dalam mengelola data secara dinamis menggunakan Permen PU no 24 Tahun 2008 yang diintegrasikan dengan sistem informasi sehingga hasil yang diharapkan dalam penelitian ini adalah meningkatnya kinerja pemeliharaan dan perawatan bangunan hijau komponen mekanikal

ABSTRACT
The reliability of functioning mechanical components has major implications for achieving green buildings mission namely emission and energy reduction. Failure in maintenance phase of mechanical components can adversely affect the achievement of the mission. Problems that occur are fragmented data, undocumented data, slow responses of human resource, and unscheduled maintenance. As a result, the massive budget spent in the green building construction phase is in vain. The purpose of this study is to improve the performance of maintenance of green buildings of government buildings in mechanical components. The case study studied was the Ministry of Public Works and Peoples Housing. The research methods used are literature reviews, case studies and system development. This study uses a Work Breakdown Structure (WBS) in managing data dynamically and managing data using Ministry Regulation no 24 Tahun 2008, which is integrated with information systems so that the expected results in this study are increasing the performance of maintenance of green building mechanical components.

 File Digital: 1

Shelf
 T55159-Aulia Rachman.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T55159
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2019
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resources
Deskripsi Fisik : xvi, 233 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T55159 15-20-500756729 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20499448