Analisis tahap perencanaan pembangunan pembangkit listrik di PT XYZ untuk meningkatkan kualitas perencanaan yang mempengaruhi kinerja waktu berbasis PMBOK = Analysis of power plant project planning in the XYZ company to improve quality planning affecting time performance based on PMBOK.

Situmorang, Ardo Christman Halomoan; Yusuf Latief, supervisor; Eddy Subiyanto, supervisor; Leni Sagita Riantini, examiner; Setyo Supriyadi Sipadi, examiner; Rossy Armyn Machfudiyanto, examiner (Fakultas Teknik Universitas Indonesia, 2016)

 Abstrak

Perencanaan merupakan penjabaran strategi yang harus dilakukan untuk mencapai target waktu yang ditetapkan dan akan sangat mempengaruhi keberhasilan suatu proyek EPC. Penelitian ini melakukan analisis peristiwa-peristiwa risiko yang terjadi pada proses perencanaan proyek pembangkit listrik berbasis PMBOK 2013 yang mempengaruhi kinerja waktu. Metode yang dilakukan ialah melalui wawancara, kuesioner, analisis statistik dan analisis peringkat risiko terhadap pegawai aktif di perencanaan PT. XYZ. Terdapat tiga (3) peristiwa dengan peringkat risiko tinggi yaitu penentuan estimasi waktu proyek yang tidak tepat, ketidaklengkapan data survey/investgasi lapangan dan kompetensi SDM yang kurang memadai. Selanjutnya dilakukan pengembangan model atau sistem perencanaan yang dapat dijadikan strategi baru untuk meningkatkan kualitas perencanaan proyek yang mempengaruhi kinerja waktu proyek  pembangkit.

Planning is the elaboration of a strategy that must be done to achieve the target set time and will greatly affect the success of some EPC project. This research do analyzing risk events that occur in the project planning process based on PMBOK  2013 power plants that affect the performance of time. The method that used is  interviews, questionnaires, statistical analysis and the analysis of risk rating of the employees in the planning of PT . XYZ. There are three (3) events risk with high risk:  determination of the estimated project time imprecise, incomplete survey data/site investigation and human resources competencies inadequate. Further, developed the model or planning system which can be used as a new strategy to increase quality of project planning that affect the performance of power plant project.

 File Digital: 1

Shelf
 T54612-Ardo Christman Halomoan Situmorang.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T54612
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Jakarta: Fakultas Teknik Universitas Indonesia, 2016
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resources
Deskripsi Fisik : xv, 113 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T54612 15-20-509190132 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20503484