:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Analisis Risiko Penjadwalan pada Pengembangan Produk Baru di Perusahaan Manufaktur Obat Bebas = Constructing Schedule Risk Analysis for New Product Development in Over-the-Counter Pharmaceutical Manufacturer.

Crisselda Meglim; M. Dachyar, supervisor; Djoko Sihono Gabriel, supervisor; Rahmat Nurcahyo, examiner; Farizal, examiner (Fakultas Teknik Universitas Indonesia, 2020)

 Abstrak

ABSTRAK
Pasar industri farmasi obat bebas telah berkembang selama 10 tahun terakhir di Indonesia dan situasi ini diperkirakan akan terus berlanjut. Potensi peningkatan permintaan hingga 8,5% per tahun. Perusahaan harus tetap menerapkan langkah dan strategi inisiatif untuk mengembangkan produk baru agar tetap kompetitif. Penjadwalan pengembangan produk baru akan menghadapi berbagai risiko berbeda yang dapat mempengaruhi dan mengganggu waktu penyelesaian pada jadwal yang telah direncanakan. Penelitian ini bertujuan untuk menganalisis risiko jadwal pengembangan produk baru di industri farmasi obat bebas sebagai referensi untuk mencegah kegagalan pada penjadwalan kegiatan sejenis. Studi ini menggabungkan metode Bayesian Network dan simulasi Monte Carlo untuk menyusun penilaian risiko terintegrasi yang berdampak pada target penyelesaian aktivitas pengembang produk. Ada 3 risiko utama yang teridentifikasi untuk diprioritaskan, yaitu keterlambatan proses pemilihan pemasok, implementasi proses yang tidak berkualitas, dan panjangnya waktu yang diperlukan importase bahan. Simulasi Monte Carlo iterasi 1000 menghasilkan kemungkinan terbesar pengembangan produk baru obat bebas ini akan selesai dalam 37 bulan dengan kemungkinan 15,5%. Total kemungkinan penyelesaian antara 35-37 bulan pada iterasi ini adalah 40,2%.

ABSTRACT
Market of over-the-counter pharmacy industry has been growing during the last 10 years in Indonesia and this situation is predicted to continue. The potential increase of demand is up to 8.5% per year. Manufacturer should keep their initiative action and strategy to develop a new product to stay competitive. New product development project faces different risks that could influence and interrupt completion at planned timeline. This study aims to construct project risk management of new product development in over-the-counter pharmacy industry as a reference to prevent identical failure in concurrent project. This study combines Bayesian Network and Monte Carlo simulation method to construct risk assessment for aggregated risk which impact on the completion target of the project. There are 3 major risks has been identified to be prioritized, which are delay in supplier selection, not qualified implementation process, and long lead time required for importation of materials. Monte Carlo Simulation under 1000 iteration results in most possible completeness of new product development within 37 months (15.5%). Total probability to complete within 35-37 months is 40.2%.

 File Digital: 1

Shelf
 T-Crisselda Meglim.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2020
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xii, 78 pages : illustration ; appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T-Pdf 15-22-25330519 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20504796